Search
-
Adapting to climate change
https://peelregion.ca/about/climate-change/adapting-climate-changeHow we can respond to extreme weather events and future climate conditions.
-
Climate Change reports and plans
https://peelregion.ca/about/climate-change/climate-change-reports-plansAccess reports and the energy conservation and demand management plan.
-
Water bill viewing or paying
https://peelregion.ca/services/water-bill-viewing-or-payingThere are several ways you can view and pay your Peel Region water bill.
-
Beaches, pools and other water
https://peelregion.ca/health/inspections-monitoring/beaches-pools-other-waterWe monitor beaches and recreational water facilities to prevent injuries and reduce illness.
-
Project 18-1357 – December 17, 2025 update
https://peelregion.ca/construction/project-18-1357-december-17-2025-updateAs part of the Flow | Central Brampton Program, Peel Region has been replacing the watermain along Queen Street West.
-
Program procedure and administration
https://peelregion.ca/about/finance/development-charges-deferral-grant-program-framework-procedureInformation about applying, retroactive applications, and payment and grant funding.
-
Sewer overflow outfall location information
https://peelregion.ca/water/wastewater/sewer-overflow-outfall-location-informationSigns mark the locations of designated overflow outfalls in Peel’s wastewater system.
-
Framework for the Peel Region Development Charges Deferral and Grant Program
https://peelregion.ca/about/finance/development-charges-deferral-grant-program-frameworkEnsuring the effective and consistent administration of Peel Region’s Development Charges Deferral and Grant Program.
-
Ontario Women's Health Centre Inc., Mississauga
https://peelregion.ca/health/inspections-monitoring/inspections-prevention-and-control-investigations/ontario-womens-health-centre-inc-mississaugaReview the details of the Infection Prevention and Control (IPAC) Lapse Report.
-
Project 24-2274 – December 19, 2025 update
https://peelregion.ca/construction/project-24-2274-december-19-2025-updatePeel Region is installing new watermain and sanitary sewer along The Gore Road. Under the Town of Caledon Noise Bylaw, tunneling work is allowed to take place continuously