East to west diversion sanitary trunk sewer

Project #16-2291

Upcoming Public Information Centre (PIC)

Contract 2 will be starting on or about January 15, 2022.

There will be a virtual PIC starting on August 25, 2021 to provide an overview of the proposed construction works and the resulting impacts. Your feedback will be vital for decision-making.

The Region of Peel is installing a large sanitary sewer pipe along Derry Rd. West, Old Derry Road, Old Creditview Road and Creditview Road. The pipe will be constructed completely in a tunnel. In order to do the tunneling, four large access points will be created for the tunnel along the construction route.

This work is to improve the existing wastewater service. Wastewater comes from flushing toilets, having a shower or washing dishes. Sanitary sewer pipes take wastewater from your home to a treatment plant.

This project will be completed under 2 parts:

Should construction require an interruption to your water supply, we will contact you to arrange a convenient time. If an emergency shutdown is required, we will inform you and attempt to minimize the inconvenience.

We will let you know if there are any substantial changes to the project.

The Region of Peel provides a safe environment that conforms to the Occupational Health and Safety Act, at all times.

Other information

The Region of Peel will be installing a large sanitary sewer pipe along Derry Rd. West.

Construction of this project will start on or about November 9, 2020. The project will take approximately four years to complete.

View area map.

Construction activities will be contained within fenced areas located away from Derry Rd. West to minimize any traffic impacts.

Project updates

Project facts

  • Pipe sizes: 2400-mm (8 ft.) sanitary sewer pipe
  • Construction Type: Tunnelling
  • Noise level: Low to Moderate
  • Contractor: McNally Construction Inc.

A large sanitary sewer pipe will be installed along Derry Rd. West, Old Derry Road, Old Creditview Road and Creditview Road. As part of this project, we will be also installing a low-pressure sewer pipe along Willow Lane.

Construction of this project will start on or about January 15, 2022. The project will take approximately 4 years to complete.

View area map for Creditview Road and Old Derry Road.

View area map for Derry Road.

Construction activities will be contained within fenced areas located away from the travelled portion of the roads to minimize any traffic impacts, except for Willow Lane and Gooderham Estates Boulevard where full closure of the roads will be required.

Project facts

  • Pipe sizes: 2400-mm (8 ft.) sanitary sewer pipe
  • Construction Type: Tunnelling
  • Noise level: Low to Moderate
  • Contractor: To be retained

Contact

The Region encourages you to notify the project manager if you have any comments or concerns.

Ajay Puri
Project Manager
Wastewater Division
905-791-7800. ext. 5073

Construction during COVID-19

Construction is an essential service. We’re keeping employees, contractors and the community safe by complying with regulations, physical distancing, using PPE and adjusting work schedules and shifts. Stay up-to-date about COVID-19 in Peel.