Mayfield Road from Chinguacousy Road to Heart Lake Road
This environmental assessment has been completed.
The Region of Peel has completed the Schedule “C” Environmental Assessment (EA) to examine the need and feasibility for widening, intersection improvements, changes to road and intersection geometrics and pavement rehabilitation on Mayfield Road to address:
- short and long term issues related to planned future growth
- operational and servicing deficiencies and
- road link capacity limitations
The study also reviewed opportunities to facilitate public transit and pedestrian movement.
Details of the EA can be viewed in the Environmental Study Report.
Study Documents
Appendices are as follows:
- A – Notification Materials and Contact Lists
- B – Comments Received during the Study
- C – Geometric Review
- D – Traffic Study and Roundabout Memo
- E – Geotechnical Report
- F – Pavement report
- G – Drainage and Stormwater Management Report
- H – Natural Heritage Assessment Report
- I – Hydrogeology Report
- J – Contaminated Soil Assessment Report
- K – Stage 1 Archaeological Assessment Report
- L – Cultural heritage Assessment Report
- M – Noise Report
- N – Air Quality Assessment Report
- O – Meeting Minutes for TAC Meetings
- P – PIC Materials
This EA has been finalized and the project has now moved into the next phase ‘Detailed Design & Construction’.
For questions or inquiries, please contact:
From Chinguacousy Road to Hurontario Street
Ommar Moeen
Project Manager
Transportation Design and Construction
Tel: 905-791-7800 ext.7998
From Hurontario Street to Heart Lake Road
Bassem Ghoneim
Project Manager
Transportation Design and Construction
Tel: 905-791-7800 ext. 5923