Airport Road - Braydon Boulevard/Stonecrest Drive to Countryside Drive
Notice of study completion
June 17, 2021 - Peel Region has completed a Class Environmental Assessment (Class EA) Study for Airport Road from Braydon Boulevard/Stonecrest Drive to Countryside Drive, in the City of Brampton.
The study was conducted according to the requirements for a Schedule C project in the Municipal Engineers Association document titled Municipal Class Environmental Assessment.
The planned improvements will benefit all transportation modes including cyclists, pedestrians, transit users and motorists and will include:
- Widening from 4 to 6 lanes to accommodate additional vehicular volumes;
- Off-road multi-use paths to accommodate cyclists and pedestrians on both sides of the street; and
- Incorporating streetscaping as feasible.
Report documents
- Airport Road from Braydon Boulevard/Stonecrest Drive to Countryside Drive Environmental Study Report
- Appendix A - Preliminary preferred design plan
- Appendix B1 - Archaelogy assessment report
- Appendix B2 - Cultural heritage resource assessment report
- Appendix C - Contamination overview study
- Appendix D1 - Natural environment
- Appendix D2 - Tree evaluation report
- Appendix E - Pavement, geotechnical, environmental and preliminary design reports
- Appendix F Drainage and stormwater management report
- Appendix G - Hydrogeology report
- Appendix H1 - Long range transportation plan validation memorandum
- Appendix H2 - Auxiliary turn lane memorandum
- Appendix H3 - Traffic signal warrant memorandum
- Appendix I - Fluvial geomorphic assessment
- Appendix J - Preliminary cost estimate
- Appendix K - Air quality assessment report
- Appendix L1 - Noise assessment report
- Appendix L2 - Peel Region private noise wall conversion policy
- Appendix L3 - Location of private noise attenuation wall study corridor
- Appendix M - Structural assessment report
- Appendix N - Public consultation
- Appendix O - Agency consultation
- Appendix P - Indigenous group consultation
Study documents
- Notice of PIC #1 (PDF)
- PIC #1 boards (PDF)
- Notice of PIC #2 (PDF)
- PIC #2 boards (PDF)
- Preliminary preferred design plan (PDF)
Contact
Randy Chawb-Naraine, Project Manager, Region of Peel