As part of the Flow Central Brampton Program, Peel Region will be installing new sanitary sewer along Malta Avenue, the multi-use pathway adjacent to Fletcher’s Creek Senior Public School, and the Region easement adjacent to Fletchers Creek, as shown on the attached map.
Sanitary sewers are underground pipes that carry wastewater from your home to a water resource recovery facility. Wastewater is created when water goes down a drain or toilet. As our population grows, we need to build larger sewers to provide you with high-quality wastewater services.
Construction schedule
Construction is planned to start July 2nd, 2025 and finish at the end of summer 2026. These dates may change due to weather and other unexpected events. All work is warrantied for two years from the completion date.
What to expect during construction
Contractor working hours
The work will be completed by Ward & Burke Microtunnelling Ltd. and designed by consultant Robinson Consultants Inc., both under contract to Peel Region. Working hours are from 7 a.m. to 7 p.m., Monday to Friday. These hours are consistent with local municipal bylaws and help shorten the amount of time construction is in your neighborhood. Construction will be primarily completed underground in tunnels and will not require digging trenches. Select areas of construction will require digging trenches and tunnelling access shafts.
Traffic and parking
We may need to temporarily close roads or reduce traffic to a single lane. If this is needed, we will place signs giving directions. On-street parking will be reduced when we are working on Malta Avenue.
Temporary trail and park closures
The sanitary sewer runs through Azores Park and along the muti-use path adjacent to Fletcher’s Creek Senior Public School, so temporary closures will be required for the duration of construction. Detour routes will be provided.
Interrupting your water supply
For residents:
- If we need to shut off your water for several hours, our goal is to let you know 48 hours (2 days) in advance. Sometimes, we must reduce this notice to 24 hours.
- If we need to shut off your water for a short time (less than one hour), we’ll knock on your door.
- If we need to shut off your water due to an emergency, we’ll knock on your door and do everything we can to fix the problem quickly.
Waste collection
If you receive Peel waste collection, your garbage, recycling, and organics will be picked up on your regularly scheduled day. It’s the contractor’s responsibility to move these bins from the end of your driveway to a location where waste collection vehicles can pick them up. Please make sure your house number is marked on each bin, so they are returned to the right address.
Vibrations, noise, and dust
You could feel slight vibrations and experience some minor noise and dust from construction work.
Construction safety
Construction zones require extra caution to keep everyone safe. Be aware of your surroundings when driving, walking, or biking near the construction area. Watch for construction crews and other road users, slow down, and consider other routes. Visit peelregion.ca/workzonesafety for more information.
Areas impacted
Installing sanitary sewers usually requires digging a trench within the municipal right-of-way. The municipal right-of-way includes the street and the municipal-owned land between the street and the water service box, a small, round, metal valve located outside on the property line between your home or business and the road. This trench might cause temporary damage to roads, curbs, sidewalks, boulevards, lawns, and the bottom of driveways.
We may also repair or replace the municipal portion of the wastewater service pipe, the smaller underground pipe running from your home to Peel’s sanitary sewer system. This may require digging up either the lawn or driveway above this section of pipe and impacting an area of at least two square meters.
We recommend that you delay driveway paving or major landscaping projects until this work is completed. Any damage caused by our construction will be repaired.
In-ground sprinkler systems
Your front lawn may be affected, so we strongly recommend moving any sprinkler lines in the municipal right-of-way or next to the sidewalk. If you cannot move these sprinkler lines, send us your irrigation map or flag each sprinkler head within one meter of the sidewalk, curb, or driveway.
Tree trimming
Branches on public and private property will be pruned beforehand if they interfere with construction. The contractor will contact you before pruning any private property trees. If you do not allow the contractor on your property, the branches will be cut vertically at the property line.
Driveway access
We’ll knock on your door if we have to block your driveway for a short time. If a trench blocks your driveway access, the contractor will provide metal road plates. We will work to ensure businesses can be accessed. Contact us if you have any access needs.
Repairing impacted areas
Once the new sanitary sewer is buried and work has been completed on all wastewater pipes, we’ll repair the road, curb, sidewalk, driveways, and lawns.
Repairs may be delayed due to seasonal weather conditions. For example:
- Paving cannot take place when the ground is saturated with water, or the temperature is below 3°C.
- Asphalt is not available in large volumes during the winter and usually becomes available in mid-May.
Most sod (grass) farms have sod available beginning in late May. We replace sod until the middle of November, weather permitting, to let the roots grow. If we do not replace it by the middle of November, we’ll replace it the following spring.
Repairing grassy areas
The contractor will replace any damaged sod on the boulevard or your front lawn and will take care of it for 30 days. You can help the sod stay healthy by watering it. A longer watering works better than watering more frequently for a shorter time. Early morning watering allows more water to soak in.
Repairing driveways
- Asphalt driveways: If we need to cut a section of your driveway, it will be repaired by paving a strip over the impacted area, resulting in minimal seams. Peel cannot replace your entire driveway. If you would like to have the rest of your driveway paved, please contact the contractor, Ward & Burke Microtunnelling Ltd. at (905) 821-3012. The contractor will then share contact information for the company hired to do the paving repairs. Please remember this is your choice. If you decide to have your entire driveway repaved, this extra paving work is your responsibility and outside Peel Region jurisdiction.
- Interlock or concrete driveways: If we damage a portion of your driveway, our contractor will repair the damaged portion.
Get the latest project updates
We value your feedback
At the end of construction, we’ll invite you to provide feedback on your experience. We understand construction can be disruptive, and we appreciate your patience as we work to improve our community’s infrastructure. This work both maintains and improves Peel’s world-class water systems, allowing us to provide reliable wastewater services to support a thriving community for life.
If you have any questions, please contact us.