Skip to main content
Region of Peel logo

Search

  • Services
  • Menu

Main navigation (Desktop)

  • Garbage and recycling

    • Collection schedules
    • Community Recycling Centres (CRCs)
    • Garbage
    • Organics
    • Recycling
    • Bulky items
    • Household hazardous waste
    • Yard waste
    Garbage and recycling
  • Water

    • Water billing
    • Drinking water
    • Wastewater
    • Flooding and leaks
    • Pipes and downspouts
    • Conserving water
    • Water meters
    • Water quality
    Water
  • Health and family

    • Children and parenting
    • Seniors
    • Diseases and infections
    • Sexual health
    • Vaccinations
    • Healthy living
    • Protecting your health
    • Inspections and monitoring
    • Business owners and operators
    • Health professionals
    • Health status data
    • Healthy schools
    • Peel Regional Paramedic Services
    Health and family
  • Housing and social support

    • Help with housing
    • Ontario Works
    • Financial and social support
    • Homeless support
    • Find a shelter
    • Housing subsidy
    • Child care subsidy
    • Housing providers
    • Peel Living
    • Housing development
    • Encampments in Peel
    Housing and social support
  • Transportation and roads

    • TransHelp
    • Peel Regional Roads
    • Road safety
    • Regular road servicing
    • Winter operations
    • Vision Zero
    • Transportation plans
    Transportation and roads
  • Construction

    • Current projects
    • Construction map
    • Environmental Assessments (EAs)
    • Work zone safety
    • Watermain projects
    • Resources for contractors
    Construction
  • Business and professionals

    • Business owners and operators
    • Health professionals
    • Early years and child care providers
    • Community partnerships
    • Procurement
    • Housing development
    • Housing providers
    • Teachers and educators
    • Planning
    • Healthy workplaces
    • Infection prevention and control
    Business and professionals
  • About Peel Region

    • Regional government
    • Council
    • Provincial review
    • Finance
    • Public Notices
    • Budget
    • Accountability and transparency
    • Climate change
    • Careers at Peel Region
    • Diversity, equity and inclusion
    • Strategies and plans
    • Advocating for Peel
    • News and media
    • Peel Data Portal
    • Contact Us
    About Peel Region
Region of Peel logo

Main navigation (Mobile)

    • Peel Region
    • Garbage and recycling
      • Collection schedules
      • Community Recycling Centres (CRCs)
      • Garbage
      • Organics
      • Recycling
      • Bulky items
      • Household hazardous waste
      • Yard waste
      • Provincial review
    • Water
      • Water billing
      • Drinking water
      • Wastewater
      • Flooding and leaks
      • Pipes and downspouts
      • Conserving water
      • Water meters
      • Water quality
      • Provincial review
    • Health and family
      • Children and parenting
      • Seniors
      • Diseases and infections
      • Sexual health
      • Vaccinations
      • Healthy living
      • Protecting your health
      • Inspections and monitoring
      • Business owners and operators
      • Health professionals
      • Health status data
        • Peel Health Data Zone Information Tool
        • Sociodemographics data
        • General health status data
        • Chronic diseases data
        • Diseases and infections data
        • Mental health data
        • Oral health data
        • Reproductive and infant health data
        • Built environment data
        • Healthy eating, active living, and sleep
        • Injuries and violence data
        • Sexual health data
        • Alcohol use data
        • Cannabis use data
        • Opioids and other substance use data
        • Tobacco and alternative tobacco product use data
        • Health care use data
        • Provincial review
      • Healthy schools
      • Peel Regional Paramedic Services
      • Provincial review
    • Housing and social support
      • Help with housing
      • Ontario Works
      • Financial and social support
      • Homeless support
      • Find a shelter
      • Housing subsidy
      • Child care subsidy
      • Housing providers
      • Peel Living
      • Housing development
      • Encampments in Peel
      • Provincial review
    • Transportation and roads
      • TransHelp
      • Peel Regional Roads
      • Road safety
      • Regular road servicing
      • Winter operations
      • Vision Zero
      • Transportation plans
      • Provincial review
    • Construction
      • Current projects
      • Construction map
      • Environmental Assessments (EAs)
      • Work zone safety
      • Watermain projects
      • Resources for contractors
      • Provincial review
    • Business and professionals
      • Business owners and operators
      • Health professionals
      • Early years and child care providers
      • Community partnerships
      • Procurement
      • Housing development
      • Housing providers
      • Teachers and educators
      • Planning
        • Official Plan
        • Provincial review
      • Healthy workplaces
      • Infection prevention and control
      • Provincial review
    • About Peel Region
      • Regional government
      • Council
      • Provincial review
      • Finance
      • Public Notices
      • Budget
      • Accountability and transparency
      • Climate change
      • Careers at Peel Region
      • Diversity, equity and inclusion
      • Strategies and plans
      • Advocating for Peel
      • News and media
      • Peel Data Portal
      • Contact Us
      • Provincial review
    • Provincial review
    1. Home
    2. Construction

    Project 19-2158

    New sanitary sewer installation

    Streets affected: Malta Avenue, pathway and easement

    Construction work in your area

    As part of the Flow Central Brampton Program, Peel Region will be installing new sanitary sewer along Malta Avenue, the multi-use pathway adjacent to Fletcher’s Creek Senior Public School, and the Region easement adjacent to Fletchers Creek, as shown on the attached map.

    Sanitary sewers are underground pipes that carry wastewater from your home to a water resource recovery facility. Wastewater is created when water goes down a drain or toilet. As our population grows, we need to build larger sewers to provide you with high-quality wastewater services.

    Construction schedule

    Construction is planned to start July 2nd, 2025 and finish at the end of summer 2026. These dates may change due to weather and other unexpected events. All work is warrantied for two years from the completion date.

    What to expect during construction

    Contractor working hours

    The work will be completed by Ward & Burke Microtunnelling Ltd. and designed by consultant Robinson Consultants Inc., both under contract to Peel Region. Working hours are from 7 a.m. to 7 p.m., Monday to Friday. These hours are consistent with local municipal bylaws and help shorten the amount of time construction is in your neighborhood. Construction will be primarily completed underground in tunnels and will not require digging trenches. Select areas of construction will require digging trenches and tunnelling access shafts.

    Traffic and parking

    We may need to temporarily close roads or reduce traffic to a single lane. If this is needed, we will place signs giving directions. On-street parking will be reduced when we are working on Malta Avenue.

    Temporary trail and park closures

    The sanitary sewer runs through Azores Park and along the muti-use path adjacent to Fletcher’s Creek Senior Public School, so temporary closures will be required for the duration of construction. Detour routes will be provided.

    Interrupting your water supply

    For residents:

    • If we need to shut off your water for several hours, our goal is to let you know 48 hours (2 days) in advance. Sometimes, we must reduce this notice to 24 hours.
    • If we need to shut off your water for a short time (less than one hour), we’ll knock on your door.
    • If we need to shut off your water due to an emergency, we’ll knock on your door and do everything we can to fix the problem quickly.

    Waste collection

    If you receive Peel waste collection, your garbage, recycling, and organics will be picked up on your regularly scheduled day. It’s the contractor’s responsibility to move these bins from the end of your driveway to a location where waste collection vehicles can pick them up. Please make sure your house number is marked on each bin, so they are returned to the right address.

    Vibrations, noise, and dust

    You could feel slight vibrations and experience some minor noise and dust from construction work.

    Construction safety

    Construction zones require extra caution to keep everyone safe. Be aware of your surroundings when driving, walking, or biking near the construction area. Watch for construction crews and other road users, slow down, and consider other routes. Visit peelregion.ca/workzonesafety for more information.

    Areas impacted

    Installing sanitary sewers usually requires digging a trench within the municipal right-of-way. The municipal right-of-way includes the street and the municipal-owned land between the street and the water service box, a small, round, metal valve located outside on the property line between your home or business and the road. This trench might cause temporary damage to roads, curbs, sidewalks, boulevards, lawns, and the bottom of driveways.

    We may also repair or replace the municipal portion of the wastewater service pipe, the smaller underground pipe running from your home to Peel’s sanitary sewer system. This may require digging up either the lawn or driveway above this section of pipe and impacting an area of at least two square meters.

    We recommend that you delay driveway paving or major landscaping projects until this work is completed. Any damage caused by our construction will be repaired.

    In-ground sprinkler systems

    Your front lawn may be affected, so we strongly recommend moving any sprinkler lines in the municipal right-of-way or next to the sidewalk. If you cannot move these sprinkler lines, send us your irrigation map or flag each sprinkler head within one meter of the sidewalk, curb, or driveway.

    Tree trimming

    Branches on public and private property will be pruned beforehand if they interfere with construction. The contractor will contact you before pruning any private property trees. If you do not allow the contractor on your property, the branches will be cut vertically at the property line.

    Driveway access

    We’ll knock on your door if we have to block your driveway for a short time. If a trench blocks your driveway access, the contractor will provide metal road plates. We will work to ensure businesses can be accessed. Contact us if you have any access needs.

    Repairing impacted areas

    Once the new sanitary sewer is buried and work has been completed on all wastewater pipes, we’ll repair the road, curb, sidewalk, driveways, and lawns.

    Repairs may be delayed due to seasonal weather conditions. For example:

    • Paving cannot take place when the ground is saturated with water, or the temperature is below 3°C.
    • Asphalt is not available in large volumes during the winter and usually becomes available in mid-May.

    Most sod (grass) farms have sod available beginning in late May. We replace sod until the middle of November, weather permitting, to let the roots grow. If we do not replace it by the middle of November, we’ll replace it the following spring.

    Repairing grassy areas

    The contractor will replace any damaged sod on the boulevard or your front lawn and will take care of it for 30 days. You can help the sod stay healthy by watering it. A longer watering works better than watering more frequently for a shorter time. Early morning watering allows more water to soak in.

    Repairing driveways

    • Asphalt driveways: If we need to cut a section of your driveway, it will be repaired by paving a strip over the impacted area, resulting in minimal seams. Peel cannot replace your entire driveway. If you would like to have the rest of your driveway paved, please contact the contractor, Ward & Burke Microtunnelling Ltd. at (905) 821-3012. The contractor will then share contact information for the company hired to do the paving repairs. Please remember this is your choice. If you decide to have your entire driveway repaved, this extra paving work is your responsibility and outside Peel Region jurisdiction.
    • Interlock or concrete driveways: If we damage a portion of your driveway, our contractor will repair the damaged portion.

    Get the latest project updates

    • Sign up for e-notices.
    • Follow Peel Public Works on X.

    We value your feedback

    At the end of construction, we’ll invite you to provide feedback on your experience. We understand construction can be disruptive, and we appreciate your patience as we work to improve our community’s infrastructure. This work both maintains and improves Peel’s world-class water systems, allowing us to provide reliable wastewater services to support a thriving community for life.

    If you have any questions, please contact us.

    Engineering Services Division
    Public Works, Peel Region
    Phone: 905-791-7800 ext. 4409

    Submit feedback and questions

    • X
    • Youtube
    • Instagram
    • Facebook
    • Linkedin

    Footer menu

    • Accessibility
    • Accountability and transparency
    • Connect to Peel email signup
    • Contact us and chat
    • Holiday hours
    • Local information (211)
    • Municipal information (311)
    • Privacy
    • Programs and services
    • Terms of use

    © Copyright Peel Region