Peel Region homepage
Peel Region
Go
main

Highway 50 and Mayfield Road

Highway 50 from Castlemore Road/Rutherford Road to Mayfield Road/Albion-Vaughan Road and Mayfield Road from Highway 50 to Coleraine Drive environmental assessment

The Region of Peel has completed the Schedule "C" Environmental Assessment (EA) to:

Details of the EA can be viewed in the Environmental Study Report.

Study Documents

Environmental Study Report

Appendix A – Preferred Design

Appendix B – Agency Consultation

Appendix C – Public Consultation

Appendix D – First Nations

First Nations Consultation

Appendix E – Study Reports

Appendix F – Utility Plans

Utility Plans and Correspondence

Appendix G – Cost Estimate

Cost Estimate

This EA has been finalized and the project has now moved into the next phase ‘Detailed Design & Construction’

For questions or inquiries, please contact:

Sandra Sadek
Project Manager
Roads – Design and Construction
Tel: 905-791-7800 ext.1149