Mississauga Road – Bovaird Drive to Mayfield Road
The Region of Peel has completed the Schedule "C" Environmental Assessment (EA) for improvements on Mississauga Road from Bovaird Drive to Mayfield Road in the City of Brampton. The EA study examined the need and feasibility for widening and improvements on Mississauga Road to address short and long term issues related to:
- planned future growth
- operational and servicing deficiencies
- intersection improvements and
- storm drainage deficiencies
Opportunities for cycling and walking and the need and feasibility of a grade separation at the CNR crossing were also reviewed.
Details of the EA can be viewed in the Environmental Study Report.
Study documents
Appendices are as follows:
- Appendix A – Consultation and Communications
- Appendix B – Transportation Problem and Opportunity
- Appendices C–H – Background reports
Drawings:
- Plan Legend
- Plan and Profile 1
- Plan and Profile 2
- Plan and Profile 3
- Plan and Profile 4
- Plan and Profile 5
- Plan and Profile 6
- Plan and Profile 7
- Plan and Profile 8
- Plan and Profile 9
- Plan and Profile 10
- Plan and Profile 11
- Plan and Profile 12
- Plan and Profile 13
- Plan and Profile 14
- Plan and Profile 15
- Plan and Profile 16
- Plan and Profile 17
- Plan and Profile 18
- Plan and Profile 19
This EA has been finalized and the project has now moved into the next phase ‘Detailed Design & Construction’.
For questions or inquiries, please contact:
Scott Durdle
Project Manager
Roads – Design and Construction
Tel: 905-791-7800 ext.5052