Skip to main content
Region of Peel logo

Search

  • Provincial review
  • Services
  • Menu

Main navigation (Desktop)

  • Garbage and recycling

    • Collection schedules
    • Community Recycling Centres (CRCs)
    • Garbage
    • Organics
    • Recycling
    • Bulky items
    • Household hazardous waste
    • Yard waste
    Garbage and recycling
  • Water

    • Water billing
    • Drinking water
    • Wastewater
    • Flooding and leaks
    • Pipes and downspouts
    • Conserving water
    • Water meters
    • Water quality
    Water
  • Health and family

    • Children and parenting
    • Seniors
    • Diseases and infections
    • Sexual health
    • Vaccinations
    • Healthy living
    • Protecting your health
    • Inspections and monitoring
    • Business owners and operators
    • Health professionals
    • Health status data
    • Healthy schools
    • Peel Regional Paramedic Services
    Health and family
  • Housing and social support

    • Help with housing
    • Ontario Works
    • Financial and social support
    • Homeless support
    • Find a shelter
    • Housing subsidy
    • Child care subsidy
    • Housing providers
    • Peel Living
    • Housing development
    • Encampments in Peel
    Housing and social support
  • Transportation and roads

    • TransHelp
    • Peel Regional Roads
    • Road safety
    • Regular road servicing
    • Winter operations
    • Vision Zero
    • Transportation plans
    Transportation and roads
  • Construction

    • Current projects
    • Construction map
    • Environmental Assessments (EAs)
    • Work zone safety
    • Watermain projects
    • Resources for contractors
    Construction
  • Business and professionals

    • Business owners and operators
    • Health professionals
    • Early years and child care providers
    • Community partnerships
    • Procurement
    • Housing development
    • Housing providers
    • Teachers and educators
    • Planning
    • Healthy workplaces
    • Infection prevention and control
    Business and professionals
  • About Peel Region

    • Regional government
    • Council
    • Provincial review
    • Finance
    • Public Notices
    • Budget
    • Accountability and transparency
    • Climate change
    • Careers at Peel Region
    • Diversity, equity and inclusion
    • Strategies and plans
    • Advocating for Peel
    • News and media
    • Peel Data Portal
    • Contact Us
    About Peel Region
Region of Peel logo

Main navigation (Mobile)

    • Home
    • Garbage and recycling
      • Collection schedules
      • Community Recycling Centres (CRCs)
      • Garbage
      • Organics
      • Recycling
      • Bulky items
      • Household hazardous waste
      • Yard waste
      • Provincial review
    • Water
      • Water billing
      • Drinking water
      • Wastewater
      • Flooding and leaks
      • Pipes and downspouts
      • Conserving water
      • Water meters
      • Water quality
      • Provincial review
    • Health and family
      • Children and parenting
      • Seniors
      • Diseases and infections
      • Sexual health
      • Vaccinations
      • Healthy living
      • Protecting your health
      • Inspections and monitoring
      • Business owners and operators
      • Health professionals
      • Health status data
        • Sociodemographics data
        • Peel Health Data Zone Information Tool
        • General health status data
        • Health care use data
        • Mental health data
        • Chronic diseases data
        • Injuries and violence data
        • Healthy eating, active living, and sleep
        • Built environment data
        • Tobacco and alternative tobacco product use data
        • Alcohol use data
        • Cannabis use data
        • Opioids and other substance use data
        • Oral health data
        • Sexual health data
        • Reproductive and infant health data
        • Diseases and infections data
        • Provincial review
      • Healthy schools
      • Peel Regional Paramedic Services
      • Provincial review
    • Housing and social support
      • Help with housing
      • Ontario Works
      • Financial and social support
      • Homeless support
      • Find a shelter
      • Housing subsidy
      • Child care subsidy
      • Housing providers
      • Peel Living
      • Housing development
      • Encampments in Peel
      • Provincial review
    • Transportation and roads
      • TransHelp
      • Peel Regional Roads
      • Road safety
      • Regular road servicing
      • Winter operations
      • Vision Zero
      • Transportation plans
      • Provincial review
    • Construction
      • Current projects
      • Construction map
      • Environmental Assessments (EAs)
      • Work zone safety
      • Watermain projects
      • Resources for contractors
      • Provincial review
    • Business and professionals
      • Business owners and operators
      • Health professionals
      • Early years and child care providers
      • Community partnerships
      • Procurement
      • Housing development
      • Housing providers
      • Teachers and educators
      • Planning
        • Official Plan
        • Provincial review
      • Healthy workplaces
      • Infection prevention and control
      • Provincial review
    • About Peel Region
      • Regional government
      • Council
      • Provincial review
      • Finance
      • Public Notices
      • Budget
      • Accountability and transparency
      • Climate change
      • Careers at Peel Region
      • Diversity, equity and inclusion
      • Strategies and plans
      • Advocating for Peel
      • News and media
      • Peel Data Portal
      • Contact Us
      • Provincial review
    • Provincial review
    1. Home
    2. Transportation and roads

    Driveway or access procedure for industrial properties

    Development applications regulated by the Planning Act. Last update January 1, 2013.

    The purpose of these design criteria is to highlight the procedure, design requirements, fees and engineering submissions of the road and access works within the right-of-way jurisdiction of the Region of Peel. The design guidelines will include widening design of existing road and construction required to facilitate the proposed development.

    The road and access improvements required to facilitate the development are determined by staff in the Traffic Engineering Section, or as indicated in the Transportation Impact Assessment. The Transportation Impact Assessment will specify the need for road requirements and identify effects of traffic generated by the proposed development on the existing road network in the immediate vicinity of the proposed development.

    Any changes and deviations from these guidelines may be acceptable, where warranted at the discretion of regional staff. The consulting engineer shall contact the appropriate staff in the Traffic Engineering section to resolve the specific problems. Should changes and deviations from these guidelines be approved by Regional staff, the consulting engineer shall confirm, in writing, the changes made and provide rationale for these required changes. Drawings shall then be updated reflecting the changes.

    Engineering submission

    Design drawing requirements

    Proposed modifications to the existing road shall clearly specify the works proposed to be carried out and shall indicate existing and proposed road composition.

    1. Proposed design modifications shall be designed to the Region’s Public Works Design Standard Specification and Procedures Manual and should comply with the latest Ontario Provincial Standards Drawing (OPSD) standards.
    2. All drawings shall indicate Region file number in the title block (e.g. D-10714781N).
    3. A key plan is to be included on all drawings in the upper right hand corner, indicating existing roads and highways around the site;
    4. Plan drawings shall be prepared at a 1:500 scale and Profile Drawings at a 1:50 scale.
    5. True North must be indicated on all drawings.
    6. All drawings shall be designed in Microstation format for final upload into the Region's records.
    7. The drawings shall comprise of the following:
      • Removals
      • New construction
      • Typical sections
      • Pavement, grading and drainage
      • Pavement markings and signage
    8. All drawings must be stamped and signed by a licensed professional engineer.
      • When new traffic control signals are required at a proposed access, the traffic control signal design shall comply with the Region’s Standard Drawings for Electrical Traffic Standards.

    Removals drawing and new construction drawing

    • Elevations are refer to geodetic datum. All base information reflecting the topographical conditions of the road within the limits of the right-of-way and on private side shall be shown. Elevations of existing and proposed pavement shall be shown every 20 metres.
    • All existing underground and aboveground utilities shall be shown on the base plans. Any existing utilities that may conflict with the proposed road works shall be identified. It is the developer’s responsibility to identify the utility conflicts, arrange for relocation and absorb all costs associated with such works.
    • Drawings shall indicate the right-of-way width with Property Line and Reserve and/or Buffer Block along the frontage of Regional road except at approved access point(s).
    • Existing centreline of the road with edge of pavement and concrete curbs at centre islands and along corner radii shall be identified.
    • Existing road infrastructure must be identified and referenced to the appropriate Ontario Provincial Standards (OPS) where applicable (i.e., curb and gutter, sidewalks, culverts, trees and/or shrubs etc.).
    • Existing access points shall be shown.
    • All ditches, driveways and drainage direction must be defined.
    • Existing storm sewer system must be identified and proposed design connection indicated.
    • Centerline profile of proposed road is required.
    • Indication on how the proposed access elevations will match the existing road elevations must be shown.
    • Access corner radii must be shown.

    Typical sections drawings

    • Cross-section every 20 metres is required and must indicate existing and proposed road composition within the limits of construction.
    • Provide sufficient joint details.
    • Existing and proposed slopes of top of pavement.
    • Existing and proposed slopes of bottom of granular and pavement.
    • In rural areas, indicate side slopes towards the bottom of ditch.
    • In urban areas indicate boulevard slopes and curb and gutter design.
    • Centre line of road and widths of the lanes, shoulders, ditch, etc. should be defined with offsets to the property line.
    • Existing ground indicated on the drawing.
    • Cross-section locations shall be indicated on the Plan and Profile Drawing with reference indicator.

    Pavement markings and signage drawing

    • Existing and proposed pavement marking shall be shown on the drawings. All pavement markings must be in accordance with the Ontario Traffic Manual (OTM) and to scale.
    • Lane widths, skips and arrow spacing, stop bar widths, storage and taper lengths indicated.
    • Existing and proposed traffic signs must be indicated.
    • Existing and proposed street name signs must be indicated.
    • Sign offsets and heights must be indicated and must comply with the OTM.
    • The advance street name signs design should be provided with details. The sign location and design must be in accordance with OTM Book 8.

    Maintenance bond

    Prior to any construction on the subject lands, the owner or developer is required to provide securities to ensure compliance with the terms and conditions per the site plan application. The securities shall be at 100% of the estimated cost of the design for the required road and access works within the Region's right-of-way. Cost estimate for the proposed road and access works shall be submitted for review and comment at the time of the final engineering submission. The required securities may be submitted in the form of a letter of credit or certified cheque. Access a sample letter of credit.

    The maintenance bond is reduced to 10% upon completion of the road works and correction of any deficiencies. The 10% hold back will remain for the duration of a one-year maintenance period.

    Letter of Undertaking

    For certain projects, a Letter of Undertaking must be completed and reviewed by Regional staff prior to being executed by the owner/applicant/developer. It is the consultant’s responsibility to obtain most up-to-date Draft Letter of Undertaking from Regional staff. Access the current Letter of Undertaking.

    P.U.C.C circulation

    Copies of the final engineering submission are circulated to all public utility members in order to eliminate and/or reduce conflicts at the time of construction. This allows public utilities to identify any existing infrastructure that may be affected by the proposed road and access works. The typical circulation process takes a minimum of 6 weeks, or a min-procedure can be exercised only for emergency purposes. In addition, the applicant/owner/developer shall acquire the public utilities to provide locates at its own discretion prior to any construction within Region right-of-way.

    Engineering fees

    For 2023, engineering fees are calculated at 10.8% of the estimated cost at a minimum fee of $1,724.40.

    Insurance certificate

    The Region requires that the contractor/applicant/developer provide a minimum 5 million dollar liability insurance coverage and that the Region of Peel be named on the certificate as additional insured. Download the insurance certificate.

    Notice to commence work

    The applicant’s contractor shall complete a “Notification to Commence Work” 48 hours prior to any commencement of construction and shall be included with the construction drawings. Download a copy of the Notification to Commence Work.

    Road occupancy permit

    All work carried out within the Region’s Right-of-Way is required to have a valid Road Occupancy Permit.

    Reference documents

    Engineering submissions shall be designed in accordance with the following reference documents:

    • Geometric Design Standards for Ontario Highways – MTO
    • Geometric Design Guide for Canadian Roads – Transportation Association of Canada (TAC)
    • OPS for Roads and Municipal Services
    • Ontario Traffic Manuals (OTM)
    • X
    • Youtube
    • Instagram
    • Facebook
    • Linkedin

    Footer menu

    • Accessibility
    • Accountability and transparency
    • Connect to Peel email signup
    • Contact us and chat
    • Holiday hours
    • Local information (211)
    • Municipal information (311)
    • Privacy
    • Programs and services
    • Terms of use

    © Copyright Peel Region