Search
-
Project 24-2300 D - July 17, 2026 update
https://peelregion.ca/construction/project-24-2300-d-july-17-2026-updatePeel Region will be rehabilitating the sanitary sewer along Cumberland Drive.
-
Notice of Public Information Centre 1 - June 23, 2026
https://peelregion.ca/construction/notice-public-information-centre-1-june-23-2026Peel Region has initiated the Bolton Zone 7 Water Elevated Storage and Transmission Mains Schedule ‘C’ Municipal Class Environmental Assessment (MCEA).
-
West Caledon storage facility and transmission main
https://peelregion.ca/construction/environmental-assessments/west-caledon-storage-facility-transmission-mainPeel Region completed the 2020 Water and Wastewater Master Plan for the Lake-based Systems.
-
Backflow prevention and cross connection surveys
https://peelregion.ca/water/backflow-prevention-cross-connection-surveysBackflow prevention stops the backflow of contaminated water from private water distribution systems into our municipal drinking water.
-
Project 24-1310 D
https://peelregion.ca/construction/project-24-1310-dWatermain improvement
-
People of Peel
https://peelregion.ca/about/people-peelOur services impact the lives of residents every day. Here are some of their stories.
-
Baby feeding support services
https://peelregion.ca/services/baby-feeding-support-servicesYou can receive information and advice on:
breast milk supply
latching
breastfeeding positions
safe formula preparation
paced bottle feeding and other topics -
Project 06-4015
https://peelregion.ca/construction/project-06-4015Reconstruction of Winston Churchill Boulevard, North of Credit River Bridge to 150m South of Mayfield Road, Brampton
-
Project 22-4680
https://peelregion.ca/construction/project-22-4680Finch Avenue corridor improvements
-
Project 23-4518
https://peelregion.ca/construction/project-23-4518Noise attenuation wall replacements on Steeles Avenue West (Regional Road #15).