Skip to main content
Region of Peel logo

Search

  • Services
  • Menu

Main navigation (Desktop)

  • Garbage and recycling

    • Collection schedules
    • Community Recycling Centres (CRCs)
    • Garbage
    • Organics
    • Recycling
    • Bulky items
    • Household hazardous waste
    • Yard waste
    Garbage and recycling
  • Water

    • Water billing
    • Drinking water
    • Wastewater
    • Flooding and leaks
    • Pipes and downspouts
    • Conserving water
    • Water meters
    • Water quality
    Water
  • Health and family

    • Children and parenting
    • Seniors
    • Diseases and infections
    • Sexual health
    • Vaccinations
    • Healthy living
    • Protecting your health
    • Inspections and monitoring
    • Business owners and operators
    • Health professionals
    • Health status data
    • Healthy schools
    • Peel Regional Paramedic Services
    Health and family
  • Housing and social support

    • Help with housing
    • Ontario Works
    • Financial and social support
    • Homeless support
    • Find a shelter
    • Housing subsidy
    • Child care subsidy
    • Housing providers
    • Peel Living
    • Housing development
    • Encampments in Peel
    Housing and social support
  • Transportation and roads

    • TransHelp
    • Peel Regional Roads
    • Road safety
    • Regular road servicing
    • Winter operations
    • Vision Zero
    • Transportation plans
    Transportation and roads
  • Construction

    • Current projects
    • Construction map
    • Environmental Assessments (EAs)
    • Work zone safety
    • Watermain projects
    • Resources for contractors
    Construction
  • Business and professionals

    • Business owners and operators
    • Health professionals
    • Early years and child care providers
    • Community partnerships
    • Procurement
    • Housing development
    • Housing providers
    • Teachers and educators
    • Planning
    • Healthy workplaces
    • Infection prevention and control
    Business and professionals
  • About Peel Region

    • Regional government
    • Council
    • Provincial review
    • Finance
    • Public Notices
    • Budget
    • Accountability and transparency
    • Climate change
    • Careers at Peel Region
    • Diversity, equity and inclusion
    • Strategies and plans
    • Advocating for Peel
    • News and media
    • Peel Data Portal
    • Contact Us
    About Peel Region
Region of Peel logo

Main navigation (Mobile)

    • Peel Region
    • Garbage and recycling
      • Collection schedules
      • Community Recycling Centres (CRCs)
      • Garbage
      • Organics
      • Recycling
      • Bulky items
      • Household hazardous waste
      • Yard waste
      • Provincial review
    • Water
      • Water billing
      • Drinking water
      • Wastewater
      • Flooding and leaks
      • Pipes and downspouts
      • Conserving water
      • Water meters
      • Water quality
      • Provincial review
    • Health and family
      • Children and parenting
      • Seniors
      • Diseases and infections
      • Sexual health
      • Vaccinations
      • Healthy living
      • Protecting your health
      • Inspections and monitoring
      • Business owners and operators
      • Health professionals
      • Health status data
        • Sociodemographics data
        • Peel Health Data Zone Information Tool
        • General health status data
        • Health care use data
        • Mental health data
        • Chronic diseases data
        • Injuries and violence data
        • Healthy eating, active living, and sleep
        • Built environment data
        • Tobacco and alternative tobacco product use data
        • Alcohol use data
        • Cannabis use data
        • Opioids and other substance use data
        • Oral health data
        • Sexual health data
        • Reproductive and infant health data
        • Diseases and infections data
        • Provincial review
      • Healthy schools
      • Peel Regional Paramedic Services
      • Provincial review
    • Housing and social support
      • Help with housing
      • Ontario Works
      • Financial and social support
      • Homeless support
      • Find a shelter
      • Housing subsidy
      • Child care subsidy
      • Housing providers
      • Peel Living
      • Housing development
      • Encampments in Peel
      • Provincial review
    • Transportation and roads
      • TransHelp
      • Peel Regional Roads
      • Road safety
      • Regular road servicing
      • Winter operations
      • Vision Zero
      • Transportation plans
      • Provincial review
    • Construction
      • Current projects
      • Construction map
      • Environmental Assessments (EAs)
      • Work zone safety
      • Watermain projects
      • Resources for contractors
      • Provincial review
    • Business and professionals
      • Business owners and operators
      • Health professionals
      • Early years and child care providers
      • Community partnerships
      • Procurement
      • Housing development
      • Housing providers
      • Teachers and educators
      • Planning
        • Official Plan
        • Provincial review
      • Healthy workplaces
      • Infection prevention and control
      • Provincial review
    • About Peel Region
      • Regional government
      • Council
      • Provincial review
      • Finance
      • Public Notices
      • Budget
      • Accountability and transparency
      • Climate change
      • Careers at Peel Region
      • Diversity, equity and inclusion
      • Strategies and plans
      • Advocating for Peel
      • News and media
      • Peel Data Portal
      • Contact Us
      • Provincial review
    • Provincial review
    1. Home
    2. Construction

    Project 15-2241

    Sanitary sewer replacement and improvement

    Streets affected: Cooksville Creek Project on Burnhamthorpe Road between Mavis Road and Cawthra Road.

    Project updates

    • August 16, 2024 Noise bylaw exemption & traffic impacts notice - Burnhamthorpe Road East from Central Parkway to Hurontario Street Aug 25 24

    Peel Region will be working in your area to install new sanitary sewers along Burnhamthorpe Road, as shown on the attached maps. Sanitary sewers are underground pipes that carry wastewater from your home or business to a wastewater treatment plant. Wastewater is created when water goes down the drain or is flushed down the toilet. As our population grows, we need to build larger sewers to keep providing high quality wastewater services.

    Construction schedule

    Construction is planned to begin August 2023 and be completed in the Fall of 2025. Once the underground work is completed on Burnhamthorpe Road, we will begin repairing any driveways, boulevards, sod (grass), roads, curbs, and sidewalks impacted by our construction work. We expect construction on this street, including the associated repair work, to be completed by the Fall of 2025. These timelines are estimates, as weather and other unexpected events may impact our timelines.

    All work is under warranty for two years from the completion date.

    Sign up for email notices

    Receive timely project updates right to your inbox by signing up for e-notices.

    Contractor and working hours

    The work will be completed by Memme Excavation Company Ltd. and supported by consultant Hatch Ltd., both under contract to Peel Region. This contractor’s normal working hours are from 7 a.m. to 7 p.m., Monday to Friday. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but shorter working days would require your area to be under construction for a longer period of time.

    Traffic and parking

    We may need to temporarily close roads or reduce traffic to a single lane during construction. If we must reroute traffic, we will place signs giving directions. On-street parking will be reduced during construction when we are actively working on your street.

    Interrupting your water supply

    We anticipate that this construction project will require temporarily shutting off your water.

    For residents:

    • It is our goal to let you know 48 hours (2 days) in advance if we plan to shut off your water for an extended period (several hours). Occasionally we may have to reduce this notice to 24 hours.
    • If we need to shut off your water for a short duration (less than one hour), we will knock on your door to notify you.
    • If we must shut off your water due to an emergency, we will knock on your door to alert you, and do everything we can to fix the problem as quickly as possible.

    For businesses:

    • If a continuous water supply is required for your business and you have not already completed a water needs survey, please contact us to let us know when and how your business uses water.
    • If we must shut off your water due to an emergency, we will knock on your door to alert you, and do everything we can to fix the problem as quickly as possible.

    Areas impacted by construction

    Installing sanitary sewers usually requires digging a trench within the municipal right-of-way. The municipal right-of-way includes the street and the land owned by the municipality between the street and your property line.

    In addition, depending on its condition, the Region of Peel may also repair or replace the municipal portion of the wastewater service pipe, the smaller underground pipe running from your home or business to the Regional sanitary sewer system. This may require digging up either the lawn or driveway above this section of pipe and disturbing an area at least two square meters.

    Any damage caused by Peel Region’s construction will be repaired.

    In-ground sprinkler systems

    As the front lawn may be affected by this construction work, if you have an in-ground sprinkler system we strongly recommend moving any sprinkler lines that are located in the municipal right-of-way or next to the sidewalk. If you can’t relocate these sprinkler lines, please send us a map created by your irrigation contractor or flag each sprinkler head that is located within one meter of the sidewalk, curb, or driveway. This will allow us to minimize the impact to your sprinkler system.

    Tree protection and trimming

    Trees located in the municipal right-of-way will be protected during construction using temporary fencing. If tree branches within the municipal right-of-way interfere with construction, the trees will be pruned beforehand.

    If tree branches on private property interfere with construction, they will be pruned back to the nearest suitable trunk or branch. The contractor will contact you before any pruning of private trees occurs. If you do not allow personnel onto your property to trim the tree, the branches will be cut vertically at the property line.

    Repairing areas impacted by construction

    We will start repairing the road, curb, sidewalk, driveways, and lawns once the new sanitary sewers and storm sewers are buried, and the new sanitary sewers have been connected to all properties on your street.

    Repairs may be delayed due to contractor availability or certain seasonal weather conditions.

    For example:

    • Paving cannot take place when the ground is saturated with water, or the temperature is below 3°C.
    • Asphalt is not available in large volumes during the winter. Asphalt usually becomes available around mid-May.
    • Most sod farms are located north of Peel. They usually have sod available beginning in late May. We will replace the sod on your property once it is available. We replace sod only until the middle of November, weather permitting, to let the sod grow roots. If we do not repair your lawn by the middle of November, we’ll replace the sod the following spring.

    Repairing grassy areas

    The contractor will replace any damaged sod (grass) on the boulevard or your front lawn and will take care of the new sod for 30 days. You can help the sod stay healthy by watering it. A longer ‘deep root watering’ works better to establish new sod than watering more frequently for a shorter time. Watering in the early morning allows more water to soak in instead of evaporating.

    Driveway access

    It may be necessary to block your driveway for a short time when crews are digging the trench for the sanitary sewer, working on your wastewater service pipe, or completing other construction activities. If so, we will knock on your door to notify you. If a trench prevents access to your driveway, the contractor will have metal road plates available to allow acces if required. Whenever possible, we will work to ensure businesses can be accessed. Please contact us if you have special needs related to access.

    Vibrations

    You could feel slight vibrations from the construction work.

    Safety during construction

    Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. Learn how to stay safe in construction zones.

    Keeping you informed

    We will let you know if there are any major changes to the plans.

    We value your feedback

    After we have finished, we will invite you to provide feedback on the construction project.

    You can sign up to receive this survey electronically.

    Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality wastewater services. If you have any questions, please contact us.

    Wastewater Collection and Conveyance
    Engineering Services Division
    Public Works, Region of Peel
    Email: construction@peelregion.ca
    Phone: 905-791-7800 ext. 4409

    • X
    • Youtube
    • Instagram
    • Facebook
    • Linkedin

    Footer menu

    • Accessibility
    • Accountability and transparency
    • Connect to Peel email signup
    • Contact us and chat
    • Holiday hours
    • Local information (211)
    • Municipal information (311)
    • Privacy
    • Programs and services
    • Terms of use

    © Copyright Peel Region