Highway 50 – Queen Street East to The Gore Road

Complete Corridor Study

About the project

Peel Region is Initiating a Complete Corridor Study for Highway 50 (Regional Road 50) from Queen Street East (Regional Road 107) to The Gore Road (Regional Road 8), within the City of Brampton. The goal of this Project is to transform Highway 50 into a “complete street” that supports all modes of transportation.

The Study will identify and recommend an implementable design solution to improve the Highway 50 Corridor, following a robust planning, consultation and design process.

We want to hear from you

Your comments are welcome at any time during the study. If you have any questions or comments regarding this study, or wish to be added to the study mailing list, please contact one of the project managers:

Neal Smith, C.E.T.
Project Manager
Infrastructure Programming and Studies
Transportation, Public Works,
Region of Peel,
10 Peel Centre Dr, Suite B, 4th Floor,
Brampton, ON L6T 4B9
905-866-3796

Altaf Hussain, P. Eng.
Consultant Project Manager
R.V. Anderson Associates Limited
4900 Palladium Way, Suite 200,
Burlington, ON L7M 0W7
289 348 1234 ext. 4516