To help make new homes available faster, Peel Region has taken a significant step toward building the water infrastructure needed to meet the housing targets outlined in the “More Homes Built Faster Act” (Bill 23). By adopting a program management approach, Peel Region is expediting the construction of essential water and wastewater infrastructure to meet community and provincial needs, both now and into the future. Committed to supporting a growing population, Peel Region is focused on creating a thriving, inclusive, and sustainable community that promotes robust infrastructure, economic growth, environmental resilience, and overall well-being.
Peel Region is taking proactive steps to achieve this goal by initiating multiple projects, including the Schedule C Municipal Class Environmental Assessment (MCEA) Study for the Kennedy Road Sanitary Trunk Sewer Project. This Project will help ensure sewage capacity requirements are met by 2051 to support growth in Peel Region. Refer to Figure 1 for Project Study area, including the recommended preferred route.
Process
This study will follow the 2023 process for a Schedule “C” MCEA project, which includes:
- Indigenous community engagement and public and stakeholder consultation
- Background studies
- Development and evaluation of sewer route options, impact assessment and mitigation measures
- Selection of the preferred sewer route including conceptual design
Public Information Centre #2
We invite you to join us for PIC #2 where we will present the evaluation of alternative routes, identify the recommended preferred route and associated conceptual design, with opportunities to provide feedback and ask questions. All materials will be posted online, including a survey open until July 9, 2025.
- When: Wednesday, June 25th, 2025, from 6 p.m. to 8 p.m
- Where: Paul Palleschi Recreation Centre (30 Loafers Lake Lane, Brampton ON L6Z 1X9), Meeting Rooms 1 & 2
Once the study is complete, results will be published in an Environmental Study Report (ESR) and will be made available for public review and comment.
Your Input on the recommended preferred route is important
The recommended preferred route, including evaluation results, is now available on our webpage for review and comment.
Contact the team
To be added to the mailing list or to receive further information about the study, please contact:
Italia Ponce, P.Eng., Project Manager,
Region of Peel
Tel: 905-791-7800 ext. 4583
Email: italia.ponce@peelregion.ca
Faranak Amirsalari, MES, MCIP, RPP
Environmental Planner, AECOM
Tel: 416-420-1286
Email: faranak.amirsalari@aecom.com
The Region of Peel is committed to ensuring that all Regional services, programs, and facilities are inclusive and accessible. Please contact the Project Manager if you need any accommodations to provide comments and/or feedback for this study.