Highway 50 and Mayfield Road
Highway 50 from Castlemore Road/Rutherford Road to Mayfield Road/Albion-Vaughan Road and Mayfield Road from Highway 50 to Coleraine Drive environmental assessment
The Region of Peel has completed the Schedule "C" Environmental Assessment (EA) to:
- analyze and evaluate current and future transportation demands for the year 2031 on Highway 50 and Mayfield Road, and,
- address operational and servicing deficiencies, standard intersection geometrics, road link capacity and storm drainage
Details of the EA can be viewed in the Environmental Study Report.
Study Documents
Appendix A – Preferred Design
Appendix B – Agency Consultation
Appendix C – Public Consultation
- Newspaper Advertisements
- Notice of Commencement
- Notices for Public Information Centre #1
- Notices for Public Information Centre #2
- Notice of Completion
- Public Information Centre #1 boards
- Public Information Centre #2 boards
Appendix D – First Nations
Appendix E – Study Reports
- Hwy 50 Mayfield Road Widening Justification Safety and Collision Assessment and Synchro Outputs
- Natural Heritage Report
- Stage l Archaeological Assessment
- Stage ll Archaeological Assessment
- Supplementary Documentation
- Cultural Heritage Report
- Hydrogeological Investigation
- Geotechnical Report
- Drainage and Stormwater Management Report
- Noise Study
- Bobolink Memorandum
- Cemetery Archaeological Investigation
- Heritage Impact Assessments
Appendix F – Utility Plans
Utility Plans and Correspondence
Appendix G – Cost Estimate
This EA has been finalized and the project has now moved into the next phase ‘Detailed Design & Construction’
For questions or inquiries, please contact:
Sandra Sadek
Project Manager
Roads – Design and Construction
Tel: 905-791-7800 ext.1149