Search
-
The Gore Road – Patterson Side Road to Highway 9
https://peelregion.ca/construction/environmental-assessments/gore-road-patterson-side-road-highway-9Improvements class environmental assessment from Patterson Side Road to Highway 9
-
Airport Road - 1km north of Mayfield Road to 600m north of King Street
https://peelregion.ca/construction/environmental-assessments/airport-road-1km-north-mayfield-road-600m-north-king-streetEnvironmental assessment from Mayfield Road to King Street.
-
Lornewood Creek sanitary sewer improvement
https://peelregion.ca/construction/environmental-assessments/lornewood-creek-sanitary-sewer-improvementPeel Region is undertaking a Class Environmental Assessment Study to determine preferred alternatives for the Lornewood Creek Sanitary Sewer improvements.
-
Royal Windsor sanitary sewer diversion
https://peelregion.ca/construction/environmental-assessments/royal-windsor-sanitary-sewer-diversionPeel Region has started the Royal Windsor Wastewater Sewer Diversion Municipal Class Environmental Assessment (MCEA) study.
-
Kirwin Avenue sanitary sewer diversion
https://peelregion.ca/construction/environmental-assessments/kirwin-avenue-sanitary-sewer-diversionPeel Region has identified the need to increase wastewater (sanitary sewer) servicing capacity.
-
Soil removal and site improvements
https://peelregion.ca/construction/soil-removal-site-improvementsPeel Region is continuing environmental soil investigation work in preparation for the community revitalization and master plan work planned for south Mississauga.
-
Inglewood Wastewater Treatment Plant upgrades
https://peelregion.ca/construction/environmental-assessments/inglewood-wastewater-treatment-plant-upgradesPeel Region has identified the need for extensive upgrades of the Inglewood Wastewater Treatment Plant (WWTP) to provide reliable performance into the future.
-
Palgrave – Caledon East Drinking Water System supply capacity
https://peelregion.ca/construction/environmental-assessments/palgrave-caledon-east-drinking-water-system-supply-capacityPeel Region owns and operates the Palgrave – Caledon East Drinking Water System a groundwater – based system.
-
Highway 50 to Hardwick Road watermain replacement
https://peelregion.ca/construction/environmental-assessments/highway-50-hardwick-road-watermain-replacementPeel Region has initiated a Schedule B Municipal Class Environmental Assessment (MCEA) study for the watermain replacement from Highway 50 to Hardwick Road.
-
Notice of completion - May 18, 2023
https://peelregion.ca/construction/environmental-assessments/notice-completion-may-18-2023Peel Region initiated a Municipal Class Environmental Assessment Study to identify, develop and implement a solution to address future capacity needs to 2041.