Project 23-1310 F
Project update
Peel Region will be working to replace the watermain on Barbertown Road, as shown in the attached map. Watermains are underground pipes. They bring tap water from our water treatment facility to your neighbourhood. As pipes age and our population grows, we need to replace older watermains to keep providing high quality water services.
Project details
The work will be completed by Vic’s Group, under contract to Peel Region. This work will be completed underground in tunnels, and will not require digging trenches in your neighbourhood. Aboveground construction activities will be mainly limited to a few fenced areas which will provide access for the tunneling equipment to enter the tunnel.
Construction schedule
Construction is planned to begin Monday, August 26th and be completed by end of September 2024. Timelines are estimates, as weather and other unexpected events may impact our timelines.
Working hours
Our contractor’s normal working hours are from 7 a.m. to 7 p.m., Monday to Friday. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but shorter working days would require this area to be under construction for a longer period of time.
Traffic impacts
This work will require a lane closure on Barber Town from Credit River to Eglinton Avenue West from Monday, August 26, 2024, at 7 a.m. until end of September 2024.
Interrupting your water supply
We anticipate that this construction project will require temporarily shutting off your water.
For residents:
- It is our goal to let you know 48 hours (2 days) in advance if we plan to shut off your water for an extended period (several hours). Occasionally we may have to reduce this notice to 24 hours.
- If we need to shut off your water for a short duration (less than one hour), we will knock on your door to notify you.
For businesses:
- If a continuous water supply is required for your business and you have not already completed a water needs survey, please contact us to let us know when and how your business uses water.
Safety during construction
Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. Learn more about how to stay safe in construction zones.
Keeping you informed
We will let you know if there are any major changes to the plans.
Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water. If you have any questions, please contact us.
Water Linear Engineering & Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409