Project 22-1340A

Watermain rehabilitation and improvement

Streets affected: Torbram Road from Steeles Avenue East to Balmoral Drive

Construction work starting in your area

Peel Region will be working in your area to clean and rehabilitate the watermain along Torbram Road, as shown on the attached map. Watermains are underground pipes that bring tap water from our water treatment plants to your area. As pipes age and our population grows, we need to replace or rehabilitate older watermains to keep providing you with high quality water.

Construction schedule

Construction is planned to begin the week of July 22, 2024 and be completed by the end of October 2024. These timelines are estimates, as weather and other unexpected events may impact our timelines. All work is under warranty for two years from the completion date.

Sign up for email notices

Receive timely project updates right to your inbox by signing up for e-notices.

What to expect during construction

In the first few weeks, the Region's contractor will move equipment on-site and prepare the work area before construction begins. Construction crews will then:

Learn what to expect during watermain construction by visiting peelregion.ca/construction/watermain and watching our short video. The video goes behind the scenes to show what happens before, during and after construction. This website also answers common questions about:

Temporary Watermain

During construction, your home/business will receive water through an above-ground temporary piping network (by-pass) installed along the curb, sidewalk, or boulevard. A hose attached to the temporary by-pass will connect to a "Y" connector via the outside hose tap of your house or connected directly to your underground service at property line for larger water services. This allows you to receive water in your home or business.

The temporary water supply network and the rehabilitated water main will be disinfected prior to hook up to your home/business in accordance with the Region of Peel’s Disinfection of Water Main procedures.

Contractor and working hours

The work will be completed by Fer Pal Infrastructure under contract to Peel Region. This contractor’s normal working hours are from 7 a.m. to 7 p.m., Monday to Friday. These hours are consistent with the local municipality's bylaws. We understand this may cause some inconvenience, but shorter working days would require your area to be under construction for a longer period of time.

Traffic and Parking

We may need to temporarily close roads or reduce traffic to a single lane during construction. If we must reroute traffic, we will place signs giving directions. On-street parking will be reduced during construction when we are actively working on your street.

Interrupting your water supply

We anticipate that this construction project will require temporarily shutting off your water.

For residents:

For businesses:

Areas impacted by construction

Rehabilitating watermains usually requires digging a trench within the municipal right-of-way, which includes the street and the land owned by the municipality between the water service box and the street. (The water service box is a small, round, metal valve located outside on the property line between your home/business and the road.) Depending on the location of the watermain, this trench might cause temporary damage to roads, curbs, sidewalks, boulevards, lawns, and the bottom of driveways within the municipal right-of-way.

To maintain your water supply, Peel Region will also replace:

This requires digging up your water service box located in the lawn or driveway, and disturbing an area at least two square meters.

We therefore recommend that you delay any driveway paving or major landscaping projects until this construction work is completed. Any damage caused by Peel Region's construction will be repaired.

In-ground sprinkler systems

As the front lawn may be affected by this construction work, if you have an in-ground sprinkler system we strongly recommend moving any sprinkler lines that are located in the municipal right-of-way or next to the sidewalk. If you can't relocate these sprinkler lines, please send us a map created by your irrigation contractor or flag each sprinkler head that is located within one meter of the sidewalk, curb, or driveway. This will allow us to minimize the impact to your sprinkler system.

Tree trimming

If tree branches within the municipal right-of-way interfere with construction, the trees will be pruned beforehand.

If tree branches on private property interfere with construction, they will be pruned back to the nearest suitable trunk or branch. The contractor will contact you before any pruning of private trees occurs. If you do not allow personnel onto your property to trim the tree, the branches will be cut vertically at the property line.

Repairing areas impacted by construction

We will start repairing the road, curb, sidewalk, driveways, and lawns once the new watermain is buried and new water service pipes have been connected to all properties on your street.

Repairs may be delayed due to contractor availability or certain seasonal weather conditions.

For example:

Repairing grassy areas

The contractor will replace any damaged sod (grass) on the boulevard or your front lawn and will take care of the new sod for 30 days. You can help the sod stay healthy by watering it. A longer 'deep root watering' works better to establish new sod than watering more frequently for a shorter time. Watering in the early morning allows more water to soak in instead of evaporating.

Repairing driveways

Driveway access

It may be necessary to block your driveway for a short time when crews are digging the trench for the watermain, replacing your water service box and pipe, or completing other construction activities. If so, we will knock on your door to notify you. If a trench prevents access to your driveway, the contractor will have metal road plates available to allow access if required. Whenever possible, we will work to ensure businesses can be accessed. Please contact us if you have special needs related to access.

Waste collection

If you receive waste collection from Peel Region, your garbage, recycling, and organics will continue to be picked up on your regularly scheduled day. It is the contractor's responsibility to move your garbage, recycling, and organics bins from the end of your driveway to a location where waste collection vehicles can pick them up. Empty containers will be returned to their corresponding addresses. Please make sure your house number is clearly marked on each bin. This helps us return empty bins to the correct address.

Vibrations

You could feel slight vibrations from the construction work.

Private-side water service replacement

We are replacing the section of the water service pipe that leads from the watermain to your water service box (small round metal valve near the property line). The privately-owned section of the water service pipe (between the service box and your home/business) is likely the same age and in the same condition. You may want to consider replacing it to ensure a constant supply of high-quality drinking water to your tap. Replacing the private-side water service pipe is the responsibility of the property owner. Peel Region cannot do this work for you. Refer to peelregion.ca/water/your-home/private-side-water-service.asp for more information.

Safety during construction

Construction zones require extra caution to keep everyone safe - pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety

Keeping you informed

We will let you know if there are any major changes to the plans.

We value your feedback

After we have finished, we will invite you to provide feedback on the construction project. You can sign up to receive this survey electronically at peelregion.ca/construction/signup

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water. If you have any questions, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409