Streets affected: Main Street South and Wellington Street, Brampton
The Region of Peel has been working in your neighbourhood to replace the watermain and sanitary sewer along Main Street South. This work is required to maintain and improve existing water services.
At this stage in the project, temporary lane reductions will be required to complete this work.
Traffic impacts
- It will be necessary to bring the new watermain into service in the middle of the Wellington Street at Main Street South, as shown in the diagram below.
- For this reason, it will not be possible to turn left from Main Street South onto Wellington Street.
- Due to the location of this work, eastbound and westbound traffic on Wellington Street will be diverted right at Main Street South, as it will not be possible to continue straight through the intersection.
- These traffic restrictions will be required from Monday July 31st, 2023, from 7:00 a.m. until 7:00 p.m.
- During this work, one lane of northbound and southbound traffic will be open on Main Street South from Queen Street to Wellington Street.
Safety during construction
Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety.
Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water. If you have any questions or concerns, please contact us.