Project 22-4517
Streets affected: Various
Project scope
Peel Region will be replacing noise attenuation walls on Erin Mills Parkway in 2025. The detailed design recently commenced, and Peel will be considering options to have this project expedited.
The various locations for the new noise attenuation walls along the west side of Erin Mills Parkway are as follows:
- Britannia Road to Banfield Road
- 320 metres south of Banfield Road
Next steps
The project is in the early stages, so the exact start date for construction is not currently available.
Prior to construction, Peel will send residents a letter requesting your permission for staff, consultants, and contractors to enter onto your property to perform the following construction activities:
- Remove existing noise walls at the rear/side of your property
- Construct temporary fencing to isolate the construction area from the remainder of the yard to maintain the security and privacy of your yard
- Construct the new noise wall
Immediately prior to construction, you will receive an additional notification regarding the timing of the project.
Feedback results
The following is the summary of the results received from the participants that provided feedback for the Noise Walls preference at this location:
- Composite concrete: 50%
- Cedar wood: 27%
- Indifferent (fine with either option): 23%
Based on the feedback results, the majority of the participants prefer Composite Concrete noise walls.
For any questions about the survey results or the project, please contact:
Sona Nezami,
Project Manager, Region of Peel
10 Peel Centre Drive, Suite B, 4th Floor,
Brampton, ON L6T 4B9
Tel: 416-884-2434
Mansoor Khorsand, P.Eng.
Project Manager,
Saferoads Engineering
136 Centre St.
Aurora, ON L4G 1K1
This notice was first issued on August 26th, 2024 by mail and re-issued in person on September 16th, 2024.