Project 21-2710
Streets affected: Cadetta Road
Within the next two years, the Region of Peel and City of Brampton plan to begin the following work on Cadetta Road, as shown on the attached map:
- Installing new sanitary sewers and maintenance holes (commonly referred to as manholes). Sanitary sewers are underground pipes that carry wastewater from your home or business to a wastewater treatment plant. Wastewater is created when water goes down the drain or is flushed down the toilet.
- Installing new storm sewers and maintenance holes. Storm sewers are underground pipes that drain water (from rain and snow) off of the roadway and carry it to local waterways.
- Completing roadway improvements.
Important note
This upcoming construction will take place in the municipal right-of-way. The municipal right-of way includes the street and the land owned by your city between the street and your water service box (small, round metal valve in either your driveway or lawn). This work may impact the bottom of your driveway and the area around the sidewalk. We therefore recommend delaying any major landscaping or driveway paving until after this construction has been completed.
Before construction begins
Before we start construction, you may notice several activities on Cadetta Road:
- We will survey your street and use temporary spray paint or flags to mark the location of underground gas, hydro, and cable on roads, driveways, and lawns.
- We may drill holes in the road or municipal right-of-way (the land between the street and property line) to collect soil samples, determine ground conditions, or confirm utility locations.
- We will take pictures and record video to help us restore the area as close as possible to its former condition, after construction takes place.
We expect these activities to take place between March 2023 and August 2023.
Keeping you informed
We are currently in the early planning stages, so we can’t give exact dates for when we will do the work. We will deliver more detailed information to your business closer to the proposed construction date.
Sign up for email notices
Receive timely updates right to your inbox by signing up for e-notices.
If you have any questions, please contact us.
Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409