Project 16-2905, Assignment 1
Streets affected: Silver Birch Trail and Marshwood Place
Project update
March 28, 2023 - Silver Birch Trail and Marshwood Place
What are we doing
Replacing and improving the aging sanitary sewer pumping station located at the end of Silver Birch Trail.
Why
To upgrade the wastewater system capacity and reliability as part of the Region of Peel’s State of Good Repair program. Pre-existing-conditions-survey-letter.
When
We expect to start work on March 23, 2023.
The project should be completed by end of 2024. All work is under warranty for two years from the completion date.
Contact information
- Email: construction@peelregion.ca
- Phone: 905-791-7800 ext. 4409
Working hours
Our contractor’s normal working hours are from 7 a.m. to 7 p.m. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but a shorter working day would mean the project would take longer to complete.
Traffic, driveway and parking control
- All roads within the project limits will always remain open to traffic however we may need to temporarily reduce traffic to a single lane during some portions of the work.
- Due to construction activities, we may need to block your driveway for a short time. We will contact you before we do this to arrange for the best time and for alternate access, if needed.
- On-street parking will be reduced during construction.
Irrigation or sprinkler systems
Please tell the inspector if you have underground irrigation or a sprinkler system outside your property line.
Trees
If tree branches within the right-of-way interfere with construction, the contractor will have the trees pruned before equipment enters the drip line of the tree.
Vibrations
You may feel slight vibrations from the construction work.
Replacing and taking care of your sod
- The contractor will replace disturbed sod after completion of construction activities on the site.
- You can help the sod to stay healthy by watering it for one hour in the early morning, two or three times a week. This is especially important in hot or dry weather.
- We will replace your sod as soon as we can, but there may be a short delay.
Project updates
- The Region of Peel will always let you know if there are any major changes to the plans.