Project 14-1256
Streets affected: Williams Parkway between Mississauga Road and Dixie Road
Project updates
- June 19, 2025 – Public Information Centre presentation
- May 15, 2025 – Notice of Public Information Centre
Construction details
Peel Region is installing a new, large watermain along Williams Parkway from Mississauga Road to Dixie Road as shown in the attached map. The watermain will be installed by tunnelling deep underground and construction will only be visible around shaft/compound areas, shown on the “Phase 1” map.
Large watermains move water between Peel’s water treatment plants and pumping stations which increases the capacity in our system. The Williams Parkway Watermain, along with other watermains being constructed in the area, will play a critical role in supplying Brampton’s downtown core with a safe and reliable drinking water and support its continued growth.
This watermain will connect the existing West Brampton Pumping Station and Reservoir on Mississauga Road to the new East Brampton watermain.
Construction schedule
The project will be divided into two major phases:
- Phase 1: McLaughlin Road to Dixie Road – Late summer 2025 to spring 2028
- Phase 2: Mississauga Road to McLaughlin Road – Fall 2026 to spring 2029
Staying informed
Receive timely project updates right to your inbox by signing up for e-notices.
Working with others
We’re coordinating our work with the City of Brampton during their road redevelopment project on Williams Parkway. It is expected this work will be completed simultaneously with the City’s work between McLaughlin Road and Dixie Road (Phase 1).