Peel Region is installing a new, large watermain along Williams Parkway from Mississauga Road to Dixie Road as shown in the attached map. The watermain will be installed by tunnelling deep underground and construction will only be visible around shaft/compound areas.
Large watermains move volumes of water between Peel’s water treatment plants and pumping stations which increases the capacity in our system. The West Brampton Watermain, along with other watermains being constructed in the area, will play a critical role in supplying Brampton’s downtown core with a safe and reliable drinking water and support its continued growth.
Construction schedule
The project will be divided into two major phases:
- Phase 1: McLaughlin Road to Dixie Road – Spring 2025 to end of 2027
- Phase 2: Mississauga Road to McLaughlin Road – Fall 2026 to spring 2029
Keeping you informed
A notice with more information and what to expect will be sent to area residents in advance of construction.
Staying informed
Receive timely project updates right to your inbox by signing up for e-notices.
Working with others
We’re coordinating our work with the City of Brampton during their road redevelopment project on Williams Parkway. It is expected this work will be completed simultaneously with the City’s work between McLaughlin Road and Dixie Road (Phase 1).
If you have any questions, please contact us.
Water Linear Engineering and Reliability
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409