Port Credit East Water and Wastewater Servicing Optimization Strategy
Background
The existing sewage pumping stations (Rosemere, Elmwood, and Hiawatha) and some of the sewage sewer mains and watermains in the general Port Credit East area are experiencing operational challenges. The Region has completed a Schedule “C” Municipal Class Environmental Assessment (EA) for this infrastructure and has selected a preferred integrated and optimized servicing strategy to meet existing and future growth.
Environmental Study Report (ESR)
The ESR is available for an extended 30-day public review period starting November 16, 2023 and ending January 4, 2024, in accordance with the requirements of the Municipal Class EA process.
- Notice of Study Completion – Re-issued November 16, 2023
- Environmental Study Report (Post Filing - February 2024)
- Appendices Volume 1 - Consultation and Engagement
- Appendices Volume 2 - Supporting Technical Studies
- Appendices Volume 3 - Class EA Evaluation and Preliminary Design
Contact information
To be added to the mailing list or to receive further information about the project, please contact:
Italia Ponce, P.Eng. Project Manager Region of Peel 905-791-7800, ext. 4583
Study commencement - November 5, 2020
PIC #1 – August 25, 2021
- Notice of PIC #1
- PIC #1 display material
- PIC #1 display material – alternate viewing option
- PIC #1 summary of comments received
PIC #2 – May 18, 2022
- Notice of PIC #2
- PIC #2 display material
- PIC #2 display material – alternate viewing option
- PIC #2 Summary of comments received