Master Plan for Peel’s Groundwater
Peel Region is responsible for the provision of municipal drinking water in several communities within the Town of Caledon. Municipal drinking water servicing is provided to ten (10) villages, hamlets and rural service centres in the Caledon area, through four (4) groundwater-based drinking water systems. Groundwater is the source of supply for well-based systems. Peel owns and operates municipal production wells located in Alton, Caledon Village, Caledon East, Palgrave, Cheltenham, and Inglewood.
Peel is initiating a Master Plan for its Groundwater-based Drinking Water Systems to support the overall Official Plan goals of providing sustainable infrastructure and services to support a diverse and growing population and economy. The Master Plan will ensure there is enough infrastructure capacity in the serviced areas of the Town of Caledon, to ensure adequate level of service and to accommodate planned growth in these areas to 2051.
The Master Plan for the Groundwater-based Drinking Water Systems is anticipated to be completed in 2025 and will:
- Align with the latest Regional Official Plan population and employment forecasts to 2051.
- Include collaboration with the local municipality, Town of Caledon, to identify priority growth areas.
- Assess potential growth beyond the 2051 planning horizon for long-term infrastructure planning purposes.
Process
Project Initiation
Summer 2023
Notice of Study Commencement
Late Winter 2023
WE ARE HERE
Public Information Centre No.1
Winter 2025
Public Information Centre No.2
Spring 2025
Notice of Study Completion Master Plan Report – Start of Review Period
Summer 2025
End of 45-day Review Period
Fall 2025
The study will follow the 2023 Municipal Engineers Association Class Environmental Assessment (EA) Master Planning, Approach 1 process. The study will:
- Satisfy Phases 1 and 2 of the Class EA process, including developing and evaluating alternative drinking water servicing strategies.
- Consider public and stakeholder input throughout the process.
- Conclude with a Master Servicing Plan Report that will be filed for public review.
Your input is important
Two (2) Public Information Centres (PICs) will be held at key points in the study to present the findings of the Master Plan Study and to provide an opportunity to give feedback to the project team.
PIC No. 1: Spring 2024 – Date to be announced at a later date.
Project documents
Contact the Team
For more information about the Master Plan for the Groundwater-based Systems, please contact either of the project team members below or team contact email at GWMasterplan@peelregion.ca, if you have questions or comments, wish to obtain more information on the project, or would like to be included on the Project Contact List.
Kamal Adhikary
Region of Peel
kamal.adhikary@peelregion.ca
Sandra Rodriguez
CIMA+
sandra.rodriguez@cima.ca
If you require any accommodations for a disability to attend and participate in meetings or events, please let us know in advance so that arrangements can be made in a timely manner. Please contact the Accessibility Advisory Coordinator through email at: aac@peelregion.ca.
With the exception of personal information, all comments will become part of the public record of the study. The study is being conducted according to the requirements of the Municipal Class Environmental Assessment, which is a planning process approved under Ontario’s Environmental Assessment Act.