Pathway Arbour Mill expansion
This development added 6 new affordable rental housing units in Mississauga.
-
Planning
-
Construction
-
Application open
-
Complete
Pathway Non-Profit Community Developments Inc. of Peel provided the land for these new affordable rental homes. This third-party led project added 6 units to the lower roof level of the existing Pathway Arbour Mill, a 98-unit affordable housing building.
The City of Mississauga approved prefabricated mass timber components to be used for this project.
The Pathway Arbour Mill expansion project is an example of gentle densification, adding to an existing site and building without having an adverse impact upon adjacent properties.
Project highlights
- Owner: Pathway Non-Profit Community Developments Inc. of Peel
- Project funding: Government of Canada, Province of Ontario, Peel Region
- Housing type: Community housing (affordable rental)
- Units: 6
The building
Pathway Arbour Mill is located at 3023 Parkerhill Road in Ward 7 in Mississauga and is close to:
- Supermarkets
- Dental and medical clinics
- Brickyard Park
- Downtown Cooksville
Project funding
- Government of Canada Rapid Housing Initiative (RHI)
- Government of Canada, Reaching Home
- Province of Ontario (MMAH) Social Services Relief Fund (SSRF)
- Peel Region
Features
- New 2-story expansion on top an existing apartment building.
- 6 thoughtfully designed units, including 4 one-bedroom units and 2 two-bedroom units, all with accessible washrooms with roll-in showers.
- Designed with sustainability in mind resulting in lower energy consumption, carbon footprint, enhanced comfort, and reduced utility bills for the social housing provider.
- Inviting shared existing common spaces areas, elevators and ground floor amenities including laundry, common rooms, and easy access to accessible visitors parking.
- Common areas and elevators ensure convenience for all residents.
Unit details
- Lots of natural light
- Barrier free dimensions including for doors and hallways
- Fully accessible washrooms
- Switches, thermostats, and outlets at barrier-free heights
- Energy-efficient refrigerator with bottom freezer
- Thermostat-controlled heating and cooling
- Vertical blinds
- Storage closets
Barrier free two-bedroom units include:
- Power door operator entry
- Fully accessible kitchens (wall oven with accessible controls, clear space under cooktop, counters and sink)
- December 2024: Construction ends.
- August 2024: Pathway holds an information session for residents.
- July 2023: Construction begins.
- June 2023: Procurement of Contractor and subcontractors are finalized.
- July 2022: Mass timber pre-fabricated mass timber components and Building Permit approval are obtained from the City of Mississauga.
- May 2022: Minor Variance and Site Plan Express (SPAX) approval are obtained from the City of Mississauga.
- September 2021: Regional Council approves the Pathway Arbour Mill expansion project.
These units have been filled.