Skip to main content
Region of Peel logo

Search

  • Provincial review
  • Services
  • Menu

Main navigation (Desktop)

  • Garbage and recycling

    • Collection schedules
    • Community Recycling Centres (CRCs)
    • Garbage
    • Organics
    • Recycling
    • Bulky items
    • Household hazardous waste
    • Yard waste
    Garbage and recycling
  • Water

    • Water billing
    • Drinking water
    • Wastewater
    • Flooding and leaks
    • Pipes and downspouts
    • Conserving water
    • Water meters
    • Water quality
    Water
  • Health and family

    • Children and parenting
    • Seniors
    • Diseases and infections
    • Sexual health
    • Vaccinations
    • Healthy living
    • Protecting your health
    • Inspections and monitoring
    • Business owners and operators
    • Health professionals
    • Health status data
    • Healthy schools
    • Peel Regional Paramedic Services
    Health and family
  • Housing and social support

    • Help with housing
    • Ontario Works
    • Financial and social support
    • Homeless support
    • Find a shelter
    • Housing subsidy
    • Child care subsidy
    • Housing providers
    • Peel Living
    • Housing development
    • Encampments in Peel
    Housing and social support
  • Transportation and roads

    • TransHelp
    • Peel Regional Roads
    • Road safety
    • Regular road servicing
    • Winter operations
    • Vision Zero
    • Transportation plans
    Transportation and roads
  • Construction

    • Current projects
    • Construction map
    • Environmental Assessments (EAs)
    • Work zone safety
    • Watermain projects
    • Resources for contractors
    Construction
  • Business and professionals

    • Business owners and operators
    • Health professionals
    • Early years and child care providers
    • Community partnerships
    • Procurement
    • Housing development
    • Housing providers
    • Teachers and educators
    • Planning
    • Healthy workplaces
    • Infection prevention and control
    Business and professionals
  • About Peel Region

    • Regional government
    • Council
    • Provincial review
    • Finance
    • Public Notices
    • Budget
    • Accountability and transparency
    • Climate change
    • Careers at Peel Region
    • Diversity, equity and inclusion
    • Strategies and plans
    • Advocating for Peel
    • News and media
    • Peel Data Portal
    • Contact Us
    About Peel Region
Region of Peel logo

Main navigation (Mobile)

    • Home
    • Garbage and recycling
      • Collection schedules
      • Community Recycling Centres (CRCs)
      • Garbage
      • Organics
      • Recycling
      • Bulky items
      • Household hazardous waste
      • Yard waste
      • Provincial review
    • Water
      • Water billing
      • Drinking water
      • Wastewater
      • Flooding and leaks
      • Pipes and downspouts
      • Conserving water
      • Water meters
      • Water quality
      • Provincial review
    • Health and family
      • Children and parenting
      • Seniors
      • Diseases and infections
      • Sexual health
      • Vaccinations
      • Healthy living
      • Protecting your health
      • Inspections and monitoring
      • Business owners and operators
      • Health professionals
      • Health status data
        • Sociodemographics data
        • Peel Health Data Zone Information Tool
        • General health status data
        • Health care use data
        • Mental health data
        • Chronic diseases data
        • Injuries and violence data
        • Healthy eating, active living, and sleep
        • Built environment data
        • Tobacco and alternative tobacco product use data
        • Alcohol use data
        • Cannabis use data
        • Opioids and other substance use data
        • Oral health data
        • Sexual health data
        • Reproductive and infant health data
        • Diseases and infections data
        • Provincial review
      • Healthy schools
      • Peel Regional Paramedic Services
      • Provincial review
    • Housing and social support
      • Help with housing
      • Ontario Works
      • Financial and social support
      • Homeless support
      • Find a shelter
      • Housing subsidy
      • Child care subsidy
      • Housing providers
      • Peel Living
      • Housing development
      • Encampments in Peel
      • Provincial review
    • Transportation and roads
      • TransHelp
      • Peel Regional Roads
      • Road safety
      • Regular road servicing
      • Winter operations
      • Vision Zero
      • Transportation plans
      • Provincial review
    • Construction
      • Current projects
      • Construction map
      • Environmental Assessments (EAs)
      • Work zone safety
      • Watermain projects
      • Resources for contractors
      • Provincial review
    • Business and professionals
      • Business owners and operators
      • Health professionals
      • Early years and child care providers
      • Community partnerships
      • Procurement
      • Housing development
      • Housing providers
      • Teachers and educators
      • Planning
        • Official Plan
        • Provincial review
      • Healthy workplaces
      • Infection prevention and control
      • Provincial review
    • About Peel Region
      • Regional government
      • Council
      • Provincial review
      • Finance
      • Public Notices
      • Budget
      • Accountability and transparency
      • Climate change
      • Careers at Peel Region
      • Diversity, equity and inclusion
      • Strategies and plans
      • Advocating for Peel
      • News and media
      • Peel Data Portal
      • Contact Us
      • Provincial review
    • Provincial review
    1. Home
    2. Construction

    Projects 24-1340A - December 4, 2023 update

    Watermain and sanitary sewer replacement and improvement

    Street affected: Fletcher Drive

    Peel Region has begun repairing driveways, roads, curbs, sidewalks, and sod (grass), following the replacement of the watermain on Fletcher Drive.

    Restoration schedule

    We plan to complete all restoration work by mid-December 2023, weather permitting. Restoration work will begin by fixing curbs and sidewalks. This will be followed by driveway and road paving repairs. Sod will then be replaced where grass has been damaged. This process will take approximately two weeks if weather conditions are favourable.

    Please note that repairs may be delayed due to contractor availability or weather conditions. 
    For example:

    • Paving cannot take place when the ground is saturated with water, or the temperature is below 3°C.
    • Asphalt is not available in large volumes during the winter. Asphalt usually becomes available around mid-May.
    • Most sod farms are located north of Peel. They usually have sod available beginning in late May. We will replace the sod on your property once it is available.
    • In summer we may need to postpone sod replacement due to hot, dry weather. We will lay the sod once weather permits.
    • We replace sod only until the middle of November, weather permitting, to let the sod grow roots. If we do not repair your lawn by the middle of November, we’ll replace the sod the following spring.

    Contractor and working hours

    The work will be overseen by Nelli Construction under contract to Peel Region. This contractor’s normal working hours are from 7 a.m. to 7 p.m., Monday to Friday. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but shorter working days would require your neighbourhood to be under construction for a longer period of time.

    Traffic impacts

    We may need to reduce traffic to a single lane during this work. If we must reroute traffic, we will place signs giving directions. On-street parking will be reduced when we are actively working on your street. If you need to park on the street, please park outside the active construction zone.

    In-ground sprinkler systems

    If the area in front of your home was affected by the construction work, in-ground sprinkler lines may be impacted during the upcoming repairs to sod, driveways, sidewalks and curbs. We strongly recommend moving any sprinkler lines that are located next to the sidewalk or driveway, or within the municipally owned right-of-way. The right-of-way is the land owned by the municipality between the street and your water service box (small, round metal valve in either your driveway or lawn).

    If you can’t relocate these sprinkler lines, please:

    • Send us a map created by your irrigation contractor, or
    • Flag each sprinkler head that is located near the sidewalk, curb, and driveway (if you have not done so already).

    This will allow us to minimize the impact to your sprinkler system.

    Replacing and taking care of your sod

    The contractor will replace any damaged sod (grass) on the boulevard or your front lawn, and will take care of the new sod for 30 days. You can help the sod stay healthy by watering it. A longer ‘deep root watering’ works better to establish new sod than watering more frequently for a shorter time. Watering in the early morning allows more water to soak in rather than evaporating.

    Road repairs

    We will repair the road where it was disturbed by our recent watermain construction. We expect these paving activities to be completed by mid-December 2023, weather permitting. We will provide a separate notice with more details on road paving closer to the date.

    Temporary restoration

    The City of Brampton is planning to complete roadwork on your street within the next few years. As this roadwork may impact the driveway, boulevard, street, curbs, and sidewalks, we will:

    • Pave only the areas of the street directly disturbed,
    • Fix damaged sidewalks and curbs using asphalt,
    • Patch your driveway to cover any places we disturbed, as the future roadwork may affect the bottom of your driveway. After the City of Brampton paves your street, the driveway will be repaired by paving a stripe over the disturbed area, resulting in minimal seams in the final driveway.

    Peel Region’s repairs are temporary, as the City of Brampton will complete restoration as part of their roadwork. The City of Brampton will send you a separate notice about their construction.

    Driveway access and parking

    We may need to block your driveway for a short time during paving activities. Whenever possible, we will work to ensure businesses can be accessed. 
    Please avoid parking in your driveway when it is being repaired to provide maximum access to the construction crew. The construction crew will knock on your door before work on your driveway begins. If you will not be home weekdays between 7 a.m. and 7 p.m. during driveway paving, please do not leave any vehicles in the driveway. 
    Once the driveway is repaired, it is important to avoid driving on the new asphalt for the first three hours afterwards, and to avoid parking on the new asphalt for one day.

    Please email us if you have special needs related to driveway access.

    Warranty on construction repairs

    Repair work completed as part of this watermain replacement project is under warranty for two years from the completion date.

    It is normal for repaired areas to settle a bit in the coming months. If you notice dead grass or large potholes forming where the driveway, street, or lawn was repaired, please let us know and we will ensure the contractor fixes this before the end of the warranty period. Once the two-year warranty period is over, Peel Region is no longer responsible for fixing potholes or dead sod (grass) in these locations.

    Safety during construction

    Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. Learn more about how to stay safe in construction zones.

    Staying informed

    We will let you know if there are any major changes to the plans.

    Receive timely project updates right to your inbox by signing up for e-notices.

    Information on this construction project can also be found on the project webpage. 

    Thank you for your patience as we complete this restoration work. If you have any questions or concerns, please contact us.

    Water Linear Engineering & Wastewater Collection and Conveyance
    Engineering Services Division
    Public Works, Region of Peel
    Email: construction@peelregion.ca
    Phone: 905-791-7800 ext. 4409

    • X
    • Youtube
    • Instagram
    • Facebook
    • Linkedin

    Footer menu

    • Accessibility
    • Accountability and transparency
    • Connect to Peel email signup
    • Contact us and chat
    • Holiday hours
    • Local information (211)
    • Municipal information (311)
    • Privacy
    • Programs and services
    • Terms of use

    © Copyright Peel Region