Project 24-1170
Streets affected: Countryside Drive between The Gore Road and Clarkway Drive.
Advance notice
Peel Region will be installing new watermain in your area within the next two years, as shown on the attached map. Watermains are underground pipes that bring tap water from our water treatment facility to your area. As our population grows, we need to build larger watermains to provide you with high-quality water.
Important note
Construction will take place in the municipal right-of-way. This includes the street and the municipal-owned land between the street and the water service box, a small, round, metal valve located outside on the property line between your home or business and the road. This work may impact the bottom of your driveway and the area around the sidewalk. We recommend that you delay major landscaping or driveway paving until construction is completed.
Before construction begins
- We’ll use spray paint or flags on roads, driveways, and lawns to locate underground gas, hydro, and cable.
- We may drill holes in the road or municipal right-of-way to collect soil samples, determine ground conditions, or confirm utility locations.
- We’ll take pictures and videos to help restore the area as close as possible to its former condition, after construction.
We expect these activities to take place in Summer 2026.
We’ll deliver more detailed information closer to the start of construction.
Get the latest project updates
We understand construction can be disruptive, and we appreciate your patience as we work to improve our community’s infrastructure. This work both maintains and improves Peel’s world-class water systems, allowing us to provide safe drinking water and reliable wastewater services to support a thriving community for life.
Water Linear Engineering & Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Peel Region
Phone: 905-791-7800 ext. 4409