Peel Region will be working in your neighbourhood to rehabilitate the existing sanitary sewer system on Kennedy Road S. south of Eastern Avenue. Sanitary sewers are underground pipes that carry wastewater from your home or business to a water resource recovery facility. Wastewater is created when water is flushed down the toilet, or goes down the drain in your sink, tub, or shower.
To extend the service life of the sewer under your street, Peel Region’s contractors will clean the existing sewer pipe and place a new resin (plastic) lining within it. This work will be completed underground with specialized equipment and will not require digging trenches in your community.
Construction schedule
We expect to conduct this work in your neighbourhood between May 12 and May 23, 2025.
Contractor and working hours
The work will be completed by Capital Sewers, supported by Andrews Engineer under contract to Peel Region. This contractor’s normal working hours are from 7 pm. to 7 a.m., Monday to Friday. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but shorter working days would require this work to affect your community over a longer period of time.
Odours
You may smell some odours while the synthetic resin inside the sewer cures. These odours are temporary and will dissipate within a few hours.
Traffic and parking
This work will be phased to minimize disruption to traffic. Access to businesses will be maintained.
Safety during construction
Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. Learn more about how to stay safe in construction zones.
Get the latest project updates
- Sign up for e-notices.
- Project information can be found on the project webpage.
- Follow Peel Public Works on X.
Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality wastewater services.
If you have any questions, please contact us.
Water and Wastewater, Engineering Services Division>br> Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800, ext. 4409