Project 17-4095 - October 15, 2025 update
Olde Base Line improvements
Streets affected: Olde Base Line Road from McLaughlin Road to Maple Avenue
Construction details
The work includes placement of top asphalt
Construction schedule
- Construction Start: October 20, 2025 - Finish: October 22, 2025 (weather permitting)
- Incomplete works caused by weather will be moved to the following day.
Working hours
- Pacific Paving Ltd. has been contracted to complete the work on the Region’s behalf.
- Hours of operation are from 7 a.m. to 7 p.m. Expect some traffic delays during these hours.
Traffic control
- The project will be phased to minimize traffic disruption while maintaining a safe working environment as required under the Occupational Health and Safety Act.
- One lane in each direction will be maintained whenever possible. Should a lane per direction not be possible, traffic will be reduced to a single lane of traffic. Traffic will be safely managed by on-site flag person and/or temporary traffic signals at all times.
- Use caution when travelling through the work zone.
- Emergency access will be maintained at all times.
Driveway access
- We will maintain driveway access as much as possible and if we need to block your driveway for a short time, you will be contacted to arrange for the best time.
- We will make sure businesses have access at all times.
Get the latest project updates
Peel Region will keep you informed of any substantial changes in the project scope or schedule. Contact the project manager if you have any special needs.
Sujan Kisiju
Project Manager
Peel Region
Phone: 905-791-7800, ext. 7813