Sanitary sewer improvements on multiple streets in Mississauga
The Region of Peel has identified the need to replace the existing sanitary sewer that runs through rear-yard easements along the tributary of Lornewood Creek north of Fair Birch Drive. A Schedule ‘B’ Municipal Class Environmental Assessment (EA) study was completed in August 2019, which identified the preferred alternative as the construction of a new sewer within existing road rights-of-way. Since that time, the design of the preferred solution has been advanced.
Online public engagement has been arranged to allow members of the public an opportunity to review the design of the proposed sanitary sewer on Birchview Drive and Fair Birch Drive. Information will be provided on how construction will be managed and how it will affect traffic and daily routines.
Public Information Centre (PIC) 2 materials
As a follow up to the completion of the original PIC, it was requested from the neighbourhood to conduct a second PIC to share updated project information. Online display boards will be made available to the public beginning September 28, 2020. Paper copies of the display boards will be made available upon request. Please submit any questions or comments by October 16, 2020.
Public Information Centre (PIC) 1 materials
- Notice of Commencement and PIC - November 27, 2018 (PDF)
- PIC Presentation (PDF)
- Notice of Completion - July 11, 2019 (PDF)
- Study report (PDF)
Contact information
If you have any questions or comments or wish to be added to the mailing list, please contact:
Sarah Lobo
Project Manager,
Capital Works Wastewater Collection and Conveyance
905-791-7800, ext. 8266