Notice of temporary road closure Conservation Drive. Project 15-2153

The Region of Peel has been working in your neighborhood to construct new sanitary sewers along Conservation Drive and Kennedy Road. This work is required to maintain and improve existing wastewater services.

At this stage in the project, the Region of Peel has finished tunnelling a new sanitary sewer under Conservation Drive. We will be connecting this new pipe to the existing sanitary sewer system west of Dawnridge Trail. A temporary road closure on Conservation Drive will be required to complete this work.

Traffic impacts

Conservation Drive will be closed to all through traffic from Hurontario Street to Kennedy Road North. This temporary road closure is expected to occur from October 17th until October 21st, 2022. (Please note: This road closure was originally planned to take place October 3rd to 7th and has been rescheduled.) During this time, a detour route will be clearly marked with road signs. Please see the attached map for the detour route. Residents who live on the street will have access to their homes. Access to businesses will be maintained. No through traffic will be allowed.

This road closure may cause traffic delays. We ask for your patience and will try to minimize any delays.

Keeping you informed

Weather and other unpredictable events may change the date of these traffic impacts. Receive timely project updates right to your inbox by signing up for e-notices at peelregion.ca/construction.

Information on this construction project can also be found at peelregion.ca/pw/construction/bram/152153.htm.

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality wastewater services. If you have any questions, please contact us.

Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

Construction during COVID-19
Construction is an essential service. We’re keeping employees, contractors and the community safe by complying with regulations, physical distancing, using PPE and adjusting work schedules and shifts. Stay up-to-date about COVID-19 in Peel.