Project 23-1310 H - November 10, 2025 update
Streets affected: Cedarglen Gate, Parmeer Drive, Clamore Crescent and Sami Street
Road paving
Peel Region will be repairing the road where it was affected by our recent watermain construction. Thank you for your cooperation while we finish this work.
Schedule
We expect road paving activities to take place on Cedarglen Gate, Parmeer Drive, Clamore Crescent and Sami Street between November 10 and November 26, 2025.
Working hours are from 7 a.m. to 7 p.m., Monday to Friday.
Road paving may be delayed due to weather conditions, as it cannot take place when the ground is saturated with water, or the temperature is below 3C.
Driveway access and parking
Do not park on the street (or leave any materials) from 7 a.m. to 7 p.m.
For the houses on Sami Street and Rosemary Drive where driveway paving is required following the completion of the watermain work, residents are requested to remove their vehicles from driveways by 7:00 a.m. on Monday, November 10, 2025.
While your street is being paved, we may block your driveway for a short time. As paving work approaches your home, we recommended parking on another street.
We have arranged for alternate parking on the streets listed above with the City of Mississauga from November 10 to November 26, 2025. Temporary parking is allowed during the daytime only. Overnight parking is not permitted. All other parking laws remain in place, including proper clearance from hydrants and stop signs.
Traffic impacts
We may need to reduce traffic to a single lane during paving activities. Work will be phased to minimize traffic disruption. If this is needed, we will place signs giving directions.
Construction safety
Construction zones require extra caution to keep everyone safe. Be aware of your surroundings when driving, walking, or biking near the construction area. Watch for construction crews and other road users, slow down, and consider other routes. Learn how to stay safe in construction zones.
Get the latest project updates
- Sign up for e-notices.
- Project information can be found on the project webpage.
We understand construction can be disruptive, and we appreciate your patience as we work to improve our community’s infrastructure. This work both maintains and improves Peel’s world-class water systems, allowing us to provide safe drinking water to support a thriving community for life.
If you have any questions, contact us.
Water Linear Engineering
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409