Project 12-4085 May 01, 2025 update
Streets affected: The Gore Road from Patterson Side Road to 100m north Finnerty Sideroad.
Further to our notices dated September 11, 2023, November 15, 2023, August 14, 2024, and September 05, 2024, Peel Region is committed to keeping you informed of the progress of this project and any changes to the project schedule. We are planning to re-mobilize to site to complete the remaining work.
The works completed to date included removals, road re-construction, culvert replacements, retaining wall installation, asphalt placement, landscaping and road signs installation.
Construction details
The work includes:
- Corrective works to existing base asphalt along the roadway
- Placement of top asphalt
- Line painting
Construction schedule
Start: Monday, May 19th ,2025 (weather permitting)
Finish: Monday, June 30th, 2025 (weather permitting)
Incomplete works caused by weather will be moved to the following week.
Working hours
Hours of operation are from 7 a.m. to 5 p.m. Expect some traffic delays during these hours.
Traffic control
- The work will be done to minimize traffic disruption while maintaining a safe working environment as required under the Occupational Health and Safety Act.
- Traffic flows will be maintained with expected stagnation during these works since a single lane will be used for maintaining north bound and south bound traffic as previously done.
- Please use caution when travelling through the work zone.
Waste collection and mail delivery
We do not anticipate any changes to your garbage and recycling schedule. Please mark your house number on your containers or bins to help with identification. Should there be any changes to mail delivery, you will be notified in advance.
Contact
Pacific Paving Ltd. (under contract to Peel Region)
Jasleen Matharu, Project Manager, 416-200-4074
Mike Wright, Site Superintendent, 416-317-3103
R.J Burnside & Associates Limited
Gustavo Izquierdo, Contract Administrator, 905-821-5927
David Argue, Project Manager, 905-821-5895
Peel Region
Randy Chawb-Naraine, Project Manager, 905-791-7800 ext. 7962
Sajmir Zesllari, Construction Inspector, 905-872-2230
We understand that this work may cause inconvenience, however, efforts will be made to minimize the impacts to the extent possible. Driveway accesses will be kept open as much as possible. If there is a need to temporarily block a driveway for construction purposes, we will be in contact with any affected resident ahead of time to determine alternative arrangements.
Peel Region is committed to keeping you informed and ensuring that the works are carried out with minimum disruption to your homes and businesses. If there are any substantial changes in the project scope or schedule, you will be provided with project updates. We also encourage you to notify the appropriate contact person to advise them of any problems or particular needs. We thank you in advance for your cooperation.