Background
Peel Region has completed the 2020 Water and Wastewater Master Plan for the Lake-based Systems, which identified the need to construct a new pressure zone 7W water storage and transmission main infrastructure for West Caledon. This Municipal Class Environmental Assessment (EA) was initiated to support this recommendation by developing, evaluating, and selecting a preferred storage facility and transmission main route to service the projected growth within the study area to 2051.
Process
The study follows a Schedule C Class EA process, including:
- Holding public and agency stakeholder engagement meetings
- Providing a solution that best meets the needs of existing and future servicing areas
- Investigating alternative long-term servicing strategies, routes, and design concepts
- Supporting the phased implementation of the preferred plan
- Confirming the preferred plan, including routes, storage sites, design, and schedule
Your input is important
Public Information Centre (PIC) No. 2 was held on September 20, 2023 and presented the evaluation of the solution alternatives within the Infrastructure Focus Area. PIC materials can be found on the project website.
A final PIC (PIC No. 3) is planned for this project.
PIC No. 3
Date and Time: Tuesday, October 7, 2025, from 5 to 7 p.m.
Location: Margaret Dunn Valleywood Library and Community Room, 20 Snelcrest Drive, Caledon
PIC No. 3 will outline the evaluation of the design concept alternatives for the preferred solution, and present the selected preliminary preferred design concept, including the siting of the elevated tank, transmission main route and feedermain route, and present the construction methodology. Information will be presented on display boards, and staff will be available to answer any questions and discuss the next steps in the study process.
Contact
Sogol Bandehali, MSc. P.Eng.
Project Manager, Peel Region
10 Peel Centre Drive, 4th Floor, Suite A
Brampton, ON, L6T 4B9
C: 437-216-7251
sogol.bandehali@peelregion.ca
To be added to the mailing list or for general inquiries, contact ZZG-WestCaledonEA@peelregion.ca
For more information on the project, visit the Project Website.
Peel Region is committed to ensuring that all Regional services, programs, and facilities are inclusive and accessible. Contact the Project Manager if you need any accommodations to provide comments and/or feedback for this study.
With the exception of personal information, all comments will become part of the public record of the study. The study is being conducted according to the requirements of the Municipal Class Environmental Assessment, which is a planning process approved under Ontario’s Environmental Assessment Act.