Notice of commencement – Sandhill pumping station, reservoir and association feedermains environmental assessment
Schedule C Municipal Class Environmental Assessment
Background
Peel Region has initiated a Schedule “C” Municipal Class Environmental Assessment (MCEA) Study for new water infrastructure in the South Caledon area. The Study area is shown in the map opposite.
Peel continues to grow, and new infrastructure is needed to ensure residents and businesses have reliable access to clean drinking water now and in the future. The purpose of the Study is to:
- Increase the water delivery capacity in the South Caledon area to address future community growth to 2051;
- Examine the need for a water reservoir, pumping station and associated feedermains that connect them to the existing system, and,
- Confirm the location of the reservoir and pumping station and the route of the associated feedermains.
The study forms part of Peel’s Flow | South Caledon Program, a new program-based approach that groups multiple water and wastewater projects within a broader geographic area to support growth in southern Caledon. It builds on previous planning work completed under the Bolton Water and Wastewater Capacity Improvements Schedule ‘C’ Study and considers new provincial housing targets introduced through Bill 23.
The process
The Study will follow the 2024 process for a MCEA Schedule “C” project, which includes:
- Engagement with review agencies, Indigenous Communities, stakeholders and the public
- Completing technical studies
- Evaluating alternative solutions and design options, considering facility locations, including potential impact on the environment and appropriate mitigation measures, and,
- Identifying the preferred facility location, any property needs and watermain routes
Your input is important
Consultation with review agencies, Indigenous communities, stakeholders and the public is an integral part of the MCEA process. Three Public Information Centers (PICs) will be held during the Study to provide members of the public with opportunities to give their feedback to the Project Team for consideration. The first PIC is anticipated to be held in Winter 2027 to present the identified problems or opportunities, the existing conditions and constraints, and an overview of the study process. The second PIC will present alternative solutions, evaluation findings, and the preliminary preferred reservoir and pumping station location with water servicing strategies. The third and final PIC will present the preliminary preferred design concept for the preferred reservoir and pumping station location and overall water strategy.
Once the Study is complete, an Environmental Study Report (final report) will be prepared and made available for public view and comments.
Contact the project team
Comments are welcomed throughout the Study. If you have any questions or comments, require further information, or would like to be included in the Study’s mailing list to receive notifications directly, contact any one of the Project Team members:
Guilherme (Will) Vieira Cerqueira, P.Eng.
Project Manager – Environmental Assessments and Studies
Water and Wastewater Infrastructure Planning
C: 437-717-9051
Will.cerqueira@peelregion.ca
Chris Campbell, MTP, MCIP, RPP, MRTPI
Vice President, Vaughan Branch
GEI Consulting Canada Ltd.
C: 289-388-7499
CCampbell@geiconsultants.com