Inglewood Wastewater Treatment Plant upgrades
Peel Region has identified the need for extensive upgrades of the Inglewood Wastewater Treatment Plant (WWTP) to provide reliable performance into the future.
A thorough design review identified upgrades which include the following.
- More efficient equipment in existing building
- Additional standby equipment for backup power or maintenance requirements
- Construction of a new treatment tank and building
New access route
A new plant access route was also identified as the existing entrance is through a private driveway causing operational concerns and disruption to the residents and their business operations. A number of alternative access routes were developed, and through extensive consultation two preferred solutions were established using the existing Caledon Trail.
How to get involved
Public consultation is key to the success of this study. We want to ensure that anyone interested in this study has the opportunity to get involved and provide input before any decisions are made.
Notice of Public Information Centre
Contact information
If you have any questions or comments or wish to be added to the mailing list, please contact:
Grace Krasowski, P.Eng.
Project Manager
Capital Works, Wastewater Division
905-791-7800, ext. 7820