Brampton West water and wastewater capacity improvements
Background
Peel Region has initiated a Schedule “C” Municipal Class Environmental Assessment (MCEA) Study for water and wastewater capacity improvements in the west Brampton area. Refer to the map of the study.
Peel continues to grow, and new infrastructure is needed to ensure residents and businesses have reliable access to clean drinking water now and in the future. The purpose of the Study is to:
- Increase the water and wastewater delivery capacity in the west Brampton area to address future community growth to 2051.
- Construct a second water transmission main alongside the existing West Brampton Transmission Main (twinning) between the Meadowvale North Pumping Station and the West Brampton Reservoir.
- Construct a new trunk sewer to supplement the existing Credit Valley Trunk Sewer.
- Include the associated water and wastewater infrastructure required to support future growth in the area.
The process
The Study will follow the 2024 process for a MCEA Schedule “C” project, which includes:
- Engagement with Indigenous Communities and consultation with agencies, stakeholders and the public;
- Completing technical studies;
- Evaluating the sewer and watermain route options, including potential impacts on the environment and appropriate mitigation measures; and
- Identifying the preferred sewer and watermain routes.
Your input is important
Consultation with review agencies, Indigenous Communities, stakeholders and the public is an integral part of the MCEA process. Two Public Information Centres (PICs) will be held during the Study to provide members of the public with opportunities to give their feedback to the Project Team for consideration. The first PIC is anticipated to be held in spring 2027, with a Notice of PIC to be issued closer to the date providing additional details. Once the Study is complete, an Environmental Study Report (final report) will be prepared and made available for public view and comment.
Contact the project team
Comments are welcomed throughout the Study. If you have any questions or comments, require further information, or would like to be included in the Study’s mailing list to receive notifications directly, contact any one of the project team members:
Guilherme (Will) Vieira Cerqueira
Project Manager
Water and Wastewater Infrastructure Planning
Phone: 437-717-9051
will.cerqueira@peelregion.ca
Dania Chehab
Consultant Project Manager
GHD Ltd.
Phone: 647-553-6893
dania.chehab@ghd.com
Peel Region is committed to ensuring that all Peel services, programs, and facilities are inclusive and accessible. Please contact the Peel Region Project Manager if you need any accommodations to provide comments and/or feedback for this study.
Map of the study