Airport Road Sanitary Trunk Sewer
Background
Peel Region has initiated a Schedule “B” Municipal Class Environmental Assessment (MCEA) Study for new wastewater infrastructure in the South Caledon and North Brampton area. Refer to the map of the study.
Peel continues to grow, and improvements to wastewater infrastructure are needed to serve residents and businesses now and in the future. The purpose of this study is to:
- Address capacity limitations in the existing Airport Road sanitary trunk sewer area and support planned growth.
- Examine opportunities to increase wastewater capacity along Airport Road.
- Identify a preferred solution considering potential sewer alignments, construction methods, tunnelling and shaft requirements, property needs, costs and implementation phasing.
The Study forms part of Peel’s Flow | South Caledon Program, a new program-based approach that groups multiple water and wastewater projects within a broader geographic area to support growth in southern Caledon. It builds on previous planning work completed, including Peel’s 2026 Water and Wastewater Master Plan, Post-2041 Study, and the Castlemore Trunk Sewer Diversion Class EA.
The process
This Study will follow the 2024 process for a MCEA Schedule “B” project, which includes:
- Engagement with review agencies, Indigenous Communities, stakeholders and the public.
- Completing technical studies.
- Evaluating alternative solutions and design options, including potential sewer alignments, construction methods, environmental impacts and appropriate mitigation measures.
- Identifying the preferred sanitary trunk sewer alignment, associated infrastructure requirements and any property needs.
Your input is important
Consultation with review agencies, Indigenous Communities, stakeholders and the public is an integral part of the MCEA process. Two Public Information Centres (PICs) will be held at key stages of the Study to provide members of the public with opportunities to give their feedback to the Project Team for consideration. The first PIC is anticipated to be held in Spring 2027 to present identified problems or opportunities, the existing conditions, potential constraints and the Class EA process. The second PIC will present alternative solutions, evaluation results and preliminary preferred solution, including the proposed trunk sewer alignment.
Once the Study is complete, the Project File Report (final report) will be prepared and made available for public view and comments.
Contact the project team
Comments are welcomed throughout the Study. If you have any questions or comments, require further information, or would like to be included in the Study’s mailing list to receive notifications directly, contact any one of the Project Team members:
Guilherme (Will) Vieira Cerqueira, P.Eng.
Project Manager – Environmental Assessments and Studies
Water and Wastewater Infrastructure Planning
Phone: 437-717-9051
will.cerqueira@peelregion.ca
Sandra Anastasio, M.Env.Sc., RPP, MCIP, EP
Senior Project Manager
GEI Consulting Canada Ltd.
Phone: 416-428-2836
sanastasio@geiconsultants.com
Peel Region is committed to ensuring that all Peel services, programs, and facilities are inclusive and accessible. Please contact the Peel Region Project Manager if you need any accommodations to provide comments or feedback for this study.
Map of the study