Goodison Avenue and Whaley Drive. Project 22-1310C

Peel Region will be repairing the road where it was disturbed by our recent watermain construction. We apologize for any inconvenience. Thank you for your cooperation while we finish this work.

Schedule

We expect road asphalt removal and paving activities to take place on Goodison Avenue and Whaley Drive between November 22nd and November 24th, 2023.

Regular working hours will be Monday to Friday between 7 a.m. and 7 p.m. Road paving activities may be delayed due to weather conditions, as paving cannot take place when the ground is saturated with water, or the temperature is below 3°C.

Driveway access

You may not have access to your driveway for a short time as the paving operation crosses your driveway.

Parking

Please do not park on the street from 7 a.m. to 7 p.m. when paving is scheduled for your street. Please ensure the road is cleared of vehicles (and any type of materials) at these times.

We apologize for any inconveniences resulting from this paving work.

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety.

Keeping you informed

Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup.

Information on this project can also be found at peelregion.ca/pw/construction/miss/221310C.asp.