Peel Region homepage
Peel Region
Go
main

Notice of road paving

Watermain and sanitary sewer replacement and improvement Missenden Crescent. Project 22-1310F

Peel Region will be repairing the road where it was disturbed by our recent watermain and sanitary sewer construction. We apologize for any inconvenience. Thank you for your cooperation while we finish this work.

Schedule

We expect road paving activities to take place on Missenden Crescent from Tuesday July 2nd to July 12th, 2024. Regular working hours will be Monday to Friday between 7 a.m. and 7 p.m.

Road paving activities may be delayed due to weather conditions, as paving cannot take place when the ground is saturated with water, or the temperature is below 3°C.

Parking and driveway access

Please do not park on the street from 7 a.m. to 7 p.m. when paving is scheduled for your street. Please ensure the road is cleared of vehicles (and any type of materials) at these times.

While your street is being paved, you may not have access to your driveway for a short time. As the paving work approaches your home, it is recommended to park on another street.

To provide an alternate parking location, we have arranged for a street parking enforcement exemption from the City of Mississauga for Missenden Crescent. This exemption is valid until Wednesday July 31, 2024. Please note that all other parking laws remain in place, including proper clearance from hydrants and stop signs. We apologize for any inconveniences resulting from this paving work.

Traffic impacts

We will need to reduce traffic to a single lane during paving activities. Work will be phased to minimize traffic disruption in the area. If we must reroute traffic, we will place signs giving directions.

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety

Keeping you informed

Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup to start signing up.

Information on this construction project can also be found at peelregion.ca/pw/construction/miss/22-1310F.asp.

If you have any questions, please contact us.

Water Linear Engineering and Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409