Resurfacing of Winston Churchill Boulevard
From Credit River Bridge to 600M south of Credit River bridge. Project 18-4055
Project Update
This work has been completed. The project is under warranty until December 22, 2025.
What are we doing?
- The Region of Peel will be carrying out the resurfacing of Winston Churchill Boulevard from Credit River bridge to 600 meters south of Credit River bridge. The work includes, but is not limited to:
- Asphalt milling and Hot mix asphalt paving.
- Grading works.
- Installation of guiderails.
- Pavement markings.
- Restoration and Minor related works.
Where?
- On Winston Churchill Boulevard from Credit River bridge to 600M south of Credit River bridge
When?
- Start: October 10, 2023
- Finish: December 2023, weather permitting.
Who can you call?
Fermar Paving Limited |
||
---|---|---|
Contact Person | Responsibilities | Telephone Number |
Pranav Shah | Project Manager | 416-579-3822 |
Vincent Ferri | Site Supervisor | 416-660-6469 |
Region of Peel |
||
Contact Person | Responsibilities | Telephone Number |
Nabiel Matta | Project Manager | 905-791-7800 x 7862 |
Ole Peterson | Site Supervisor | 416-434-6538 |
Working hours
- The Contractor’s normal day working hours are from 7:00a.m. to 7:00p.m, Monday to Friday. The Contractor will utilize this time to complete all major works.
- The Contractor is also permitted to work on Saturdays, as may be required from 9:00a.m. to 3:30p.m.
- These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but a shorter working day would mean the project would take longer to complete.
Traffic Control
- One lane of traffic will be maintained at all times, during working hours with a flag person present.
- Emergency access will be maintained at all times.
- Barriers and signs will be placed for safety and direction, as required under the Occupational Health and Safety Act.
- Use caution when travelling through the work zone.
Driveway access
- We anticipate that driveway accesses will be maintained.
- If we need to block your driveway for a short time, you will be contacted to arrange for the best time and for alternate access, if available.
- Please call the Project Manager if you have special needs related to access.
Project updates
- The Region of Peel will keep you informed of any substantial changes in the project scope or schedule.
- We are committed to ensuring minimum disruption to your homes and businesses.
- Please call the Project Manager or Inspector if you have any special needs.
Who can you contact?
Nabiel Matta,
Project Manager
Region of Peel
905-791-7800 ext. 7862.