Watermain replacement and improvements
Vodden Street East from Main Street North to Centre Street North. Project 23-1340 C
The new watermain on Vodden Street East has now been installed. The next phase is to bring the new watermain into service. Properties on these streets will now have their individual water service pipes transferred from the old watermain to the new watermain.
A new water service pipe will be installed from the watermain to your property line, where a new water service box will also be installed. The water service box is a small round metal valve typically located in your driveway or lawn at the front of your property. Replacing your water service box requires digging up your existing water service box and disturbing an area at least two square meters.
Where possible, your water service pipe will be installed using tunneling equipment. If tunnelling isn’t possible due to ground or environmental conditions, the contractor will need to dig a trench to install the new pipe.
Any damage caused by Regional construction will be repaired:
- If your water service box is in your lawn, we will replace the sod in the disturbed area.
- If your water service box is in your driveway, we will repair the driveway by paving a stripe over the disturbed area, resulting in minimal seams in the final driveway. If construction activities cause additional damage to the driveway, we’ll repair those areas too.
Interrupting your water supply
Connecting your property to the new watermain will require temporarily shutting off your water.
For businesses:
- On the day we connect your water service to the new watermain, your water will be temporarily shut off. We will notify you in advance to share the date and time of this water interruption.
Schedule
We expect to start connecting water service pipes to the new watermain on Vodden Street East around the week of October 30,2023. We expect to complete this work by November 17,2023.
Once we have connected all properties to the new watermain, we will start repairing driveways, roads, curbs, sidewalks, and sod (grass).
Please note that repairs may be delayed due to contractor availability or weather conditions.
For example:
- Paving cannot take place when the ground is saturated with water, or the temperature is below 3°C.
- Asphalt is not available in large volumes during the winter. Asphalt usually becomes available around mid-May.
- Most sod farms are located north of Peel. They usually have sod available beginning in late May. We will replace the sod on your property once it is available.
- We replace sod only until the middle of November, weather permitting, to let the sod grow roots. If we do not repair your lawn by the middle of November, we’ll replace the sod the following spring.
Repair work completed as part of this watermain replacement project is under warranty for two years from the completion date.
Temporary restoration
Your city is planning to complete roadwork on your street within the next few years. As this roadwork may impact the driveway, boulevard, street, curbs, and sidewalks, we will:
- Pave only the areas of the street directly disturbed,
- Fix damaged sidewalks and curbs using asphalt,
- Patch your driveway to cover any places we disturbed, as the future roadwork may affect the bottom of your driveway. After the city/town paves your street, the driveway will be repaired by paving a stripe over the disturbed area, resulting in minimal seams in the final driveway.
Peel Region’s repairs are temporary, as the city will complete restoration as part of their roadwork. Your city will send you a separate notice about their construction.
Contractor and working hours
The work will be completed by Rymall Construction under contract to Peel Region. This contractor’s normal working hours are from 7 a.m. to 7 p.m., Monday to Friday. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but shorter working days would require your neighbourhood to be under construction for a longer period of time.
Safety during construction
Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety.
Staying informed
Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup.
Information on this project can also be found at peelregion.ca/pw/construction/bram/23-1340C.asp
We will try to disturb you as little as possible, and we will let you know if there are any major changes to the plans.
Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water. If you have any questions or concerns, please contact us.