Peel Region homepage
Peel Region
Go
main

Project 18-1380 May 28, 2024 update

Road Paving and Traffic Updates - Main Street from Nelson Street West / Theatre Lane to Wellington Street.

Peel Region will be temporarily repairing and resurfacing the road where it was disturbed by our recent watermain and sanitary sewer construction. We apologize for any inconvenience. Thank you for your cooperation while we finish this work.

Schedule

The road paving activities will take place on Main Street from Nelson Street West / Theatre Lane to Wellington Street. The traffic impacts have been extended until as late as 7 p.m. on Friday, June 7, 2024.

Road paving activities may be delayed due to weather conditions, as paving cannot take place when the ground is saturated with water, or the temperature is below 7°C.

Regular working hours will be Monday to Friday between 7 a.m. and 7 p.m.

Parking and driveway access

There will be no on-street parking within the construction area. Please ensure the road is cleared of vehicles (and any type of materials) at these times.

We apologize for any inconveniences resulting from this paving work.

Traffic impacts

We will need to reduce traffic to a single lane in each direction during these paving activities. Work will be phased to minimize traffic disruption in the area. There will be brief impacts while we are passing through the intersections. During this time, traffic will be directed by police officers or flag persons. If we must reroute traffic, we will place signs giving directions.

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety.

Keeping you informed

Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup.

Information on this project can also be found at peelregion.ca/downtownbrampton.

Follow Peel Public Works on Twitter for service updates and changes.

Water Linear Engineering
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409