Peel Region homepage
Peel Region
Go
main

Watermain replacement and impreovement

Elizabeth Street South and Queen Street West. Project 18-1380

The Region of Peel has been working in your neighborhood to replace the watermain along Queen Street West. This work is required to maintain and improve existing water and wastewater services.

At this stage in the project, temporary lane closures and turning restrictions will be required to complete this work.

Traffic impacts

It will be necessary to connect the water services in the eastbound lanes of Queen Street at Elizabeth Street South.

These temporary traffic impacts are expected to occur on Monday, May 1, 2023, from 7 a.m. till 5 p.m. We apologize for any delays or inconvenience resulting from these traffic impacts.

Sample diagram illustrating how the work area prevents vehicles from Elizabeth Street South being able to turn left or right onto Queen Street West

Keeping you informed

We will let you know if there are any major changes to the plans.

Weather and other unpredictable events may change the date of these traffic impacts. Receive timely project updates right to your inbox by signing up for e–notices at peelregion.ca/construction

Follow Peel Public Works on Twitter (twitter.com/peelpublicworks) for project updates.

Information on this project can also be found at peelregion.ca/downtownbrampton

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water. If you have any questions, please contact us.

Water Linear Engineering and Reliability
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409