Marc Court and Elgin Drive from McMurchy Avenue South to McLaughlin Road South. Project 22-1340 C

Peel Region will be repairing the road where it was disturbed by our recent watermain construction. We apologize for any inconvenience. Thank you for your cooperation while we finish this work.

Schedule

We expect road paving activities to take place on Elgin Drive and Marc Court between September 21st and September 23rd, 2023.

Regular working hours will be Monday to Friday between 7 a.m. and 7 p.m. Some paving work may take place on Saturday, from 7 p.m. to 7 a.m., to reduce the impact of paving operations on traffic congestion and local businesses.

Road paving activities may be delayed due to weather conditions, as paving cannot take place when the ground is saturated with water, or the temperature is below 3°C.

Parking and driveway access

Please do not park on the street from 7 a.m. to 7 p.m. when paving is scheduled for your street. Please ensure the road is cleared of vehicles (and any type of materials) at these times.

While your street is being paved, you may not have access to your driveway for a short time. As the paving work approaches your home, it is recommended to park on another street.

To provide an alternate parking location, we have arranged for a street parking enforcement exemption from the City of Brampton for Parkend Avenue. This exemption is valid until September 30th, 2023. Please note that all other parking laws remain in place, including proper clearance from hydrants and stop signs.

Traffic impacts

We may need to reduce traffic to a single lane during paving activities. Work will be phased to minimize traffic disruption in the area. If we must reroute traffic, we will place signs giving directions.

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. Learn how to stay safe in construction zones.

Keeping you informed

Receive timely project updates right to your inbox by signing up for e-notices.

If you have any questions, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409