Watermain and sanitary sewer replacement and improvement

Airport Road, Brampton. Project 21-2300 D.

Peel Region is working in your neighbourhood to rehabilitate the storm sewer on Airport Road. This work will take place overnight to rehabilitate the storm sewer on Airport Road north of Intermodal Drive and to minimize the impact of traffic congestion. We apologize in advance for any inconveniences caused by this work.

Schedule

This overnight work is expected to take place for one evening, December 13, 2023 to December 14th, from 7 am until 7 am. Additional nights may be required due to unpredictable delays, such as poor weather conditions.

Traffic impacts

This work will require a lane closure of the curb lane north and south bound, north of Intermodal Drive from 7am to 7am. Signage will be available for detour route directions.

Noise

We do not anticipate significant noise or vibrations above normal daytime traffic levels during these operations. Efforts will be made to reduce impacts to residents as much as possible.

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety

Keeping you informed

We will let you know if there are any major changes to the plans. Follow Peel Public Works on Twitter (twitter.com/peelpublicworks) for project updates.

Information on this project can also be found at https://peelregion.ca/pw/construction/21-2300D.asp

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality Storm Water Services. If you have any questions, please contact us.

Water Linear Engineering & Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409