A-Z List | Accessible Info | Careers | Contact Us

 
Images from Peel Region
Public Works on Twitter
Google Translate Feedback
Was this translation useful?
Yes No
Comments on translation:

Thank you for your feedback!
Public Works Transportation Environmental Assessments

Environmental Assessments: Caledon

Mississauga Road, Old Main Street, Bush Street, Winston Churchill Boulevard and Olde Base Line Road

The Region of Peel has completed the Schedule “C” Municipal Class Environmental Assessment (EA) for improvements to Mississauga Road from Olde Base Line Road to Bush Street and Bush Street from Mississauga Road to Winston Churchill Boulevard.

Based on the feedback received for the Mississauga Road/Bush Street EA, the study area was expanded to review road safety, sight lines, drainage, parking and pedestrian and cycling needs. The new study limits included Olde Base Line Road from Mississauga Road to Winston Churchill Boulevard, and Winston Churchill Boulevard from Olde Base Line Road to Bush Street see map (PFD 261KB, 1 page).

Increasing the number of lanes was not under consideration. The EA built on the previous study to provide a solution for the study area that met the needs of all road users and maintained the character of the community.

For details of the EA see the link below to the Environmental Study Report (ESR). The link to the Addendum to the ESR also details the removal of a section of the study area from the Class EA study (see Appendix B of the Addendum).

Study Documents

Community Working Group

Study Completion

Back to Current Environmental Assesments

Revised: Monday December 05 2016

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text