Construction of 1200MM sanitary sewer

Kennedy Road North. Project 15-2153

The Region of Peel will be installing a large sanitary sewer pipe along Kennedy Road North and Conservation Drive. The pipe will be constructed by tunnelling method (microtunnelling). To do the tunneling, six access points will be created for the tunnel along the construction route. View attached map.

This work is to improve the existing wastewater service and to provide additional sewer capacity. Wastewater comes from flushing toilets, having a shower or washing dishes. Sanitary sewer pipes take wastewater from your home to a treatment plant.

Should construction require an interruption to your water supply, it is our goal to let you know 48 hours (2 days) in advance. Occasionally, we may have to reduce this notice to 24 hours. If an emergency shutdown is required, we will inform you and attempt to minimize the inconvenience.

When?

Minimizing construction impacts to you

Safety during construction

To stay informed

We’d like to hear from you