THE REGIONAL MUNICIPALITY OF PEEL |
BY-LAW NUMBER 135- 2004 |
A by-law to amend By-Law 1-2004, titled the "Amended
User Fees and Charges By-Law 1-2004".
|
WHEREAS the Council of the Regional Municipality ("Regional Corporation")
on December 12, 2002, passed By-Law 66-2002 amending By-Law 43-2002, to impose
fees for services and activities provided by the Regional Corporation or for
the use of its property;
WHEREAS By-law 1-2004 amends By-Law 66-2002, by amending Schedule A to By-Law 66-2002 with a new Schedule A to impose additional fees, delete fees and change fees for services and activities provided by the Regional Corporation or for the use of its property;
WHEREAS the Council of the Regional Corporation has by resolution adopted on November 18, 2004, authorized that By-Law 1-2004 be amended to substitute the rates and charges set out in Schedule A hereto for the corresponding rates and charges set out in Schedule A to By-Law 1-2004;
NOW THEREFORE, the Council of the Regional Corporation enacts as follows:
1. Schedule A to By-Law 1-2004 is amended to substitute and replace the rates and charges set out in Schedule A attached hereto for the comparable corresponding rates and charges set out in Schedule A to By-Law 1-2004.
2. This by-law and attached Schedule A outlining the additional fees, deleted fees and any changes to existing fees is hereby adopted and enacted.
3. Despite the amendment of By-Law 1-2004 herein, that the tariff of fees set out in Schedule A to By-Law 1-2004, on the day immediately prior to the day this by-law comes into effect, shall continue to apply to fees which became payable prior to the date upon which this by-law comes into effect.
4. Adjustments to specified fees may be granted as follows:
1. Fee number 2, Schedule 3, Division 2 may be adjusted to recover "All staff time required for the processing, review and execution of a FEFA are to be recovered from the proponent - billing rates will be set at the specific staff rate established for internal charge purposes."
2. Fee numbers 1-10, Schedule 4, Division 4 may be adjusted by "Healthy Sexuality" staff (Physicians, supervisor, manager, registered nurses, public health nurses all of whom are employed by the Region of Peel), as a result of changes to the cost of existing projects and/or changes in products as directed by the Ministry of Health and Long-Term Care."
5. This By-Law may be referred to as the Amended User Fees and Charges By-Law, 2005."
6. This By-law takes effect on December 31, 2004.
READ THREE TIMES AND FINALLY PASSED IN OPEN COUNCIL this 9th day of December,
2004.
C.
Gravlev ________________________ Regional Clerk |
E.
Kolb ______________________ Regional Chair |
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Schedule
1: General Corporate Information Request Fees (applies to requests handled outside MFIPPA) |
|||||
1 | Photocopies "*" | page | $0.20 |
+
|
'*' + if over 1 copy
|
2 | Other Costs (from outside providers) | request | Actual Costs |
n/a
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | Council Agenda | year | $221.48 |
+
|
+
|
2 | Council Minutes | year | $115.74 |
+
|
+
|
3 | Agenda - Housing | year | $140.00 |
+
|
+
|
4 | Agenda - Human Services | year | $140.00 |
+
|
+
|
5 | Agenda - Management | year | $140.00 |
+
|
+
|
6 | Agenda - Planning | year | $210.00 |
+
|
+
|
7 | Agenda - Public Works | year | $210.00 |
+
|
+
|
8 | Agenda - Peel Living | year | $140.00 |
+
|
+
|
9 | Committee Minutes | year | $90.00 |
+
|
+
|
10 | Certification of Documents | document | $30.00 |
n/a
|
n/a
|
11 | Commissioning of Affidavits (non-Regional business) | document | $30.00 |
n/a
|
n/a
|
12 | Council/Committee Audio Reproduction | hour | $50.00 |
+
|
+
|
13 | Transcriptions | hour | $50.00 |
+
|
+
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | Commissioning of Affidavits (non-Regional business) | document | $30.00 |
n/a
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | Emergency Plans | document | $5.00 |
n/a
|
n/a
|
2 | 9-1-1 Call Tapes | tape | $75.00 |
n/a
|
+
|
3 | Ambulance Paid Duty with Administration Fee | per hour | $150.00 |
n/a
|
n/a
|
4 | Ambulance Call Report | document | $75.00 |
n/a
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | New Account Charge | account | $31.00 |
n/a
|
n/a
|
Turn-off or
Turn-on for Collection (extended hours - Monday-Friday, 8:30 am - 9:00 pm) |
|||||
1 | Standard residential service size (extended hours) n/a n/a | turn-on/off | $38.00 |
n/a
|
n/a
|
2 | Commercial service size (extended hours) n/a n/a | turn-on/off | $79.00 |
n/a
|
n/a
|
Customer-Requested
Turn-off or Turn-on (regular hours - Monday-Friday, 7:30 am - 4:00 pm) |
|||||
1 | Service Rep. Call re. Overdue Account | call | $27.00 |
n/a
|
n/a
|
2 | N.S.F. Cheque | cheque | $15.00 |
n/a
|
n/a
|
3 | Statement Letter (billing history) | letter | $70.00 |
n/a
|
n/a
|
Replacement Charges - Damaged Equipment | |||||
1 | Standard Residential Service Size | equipment | $51.57 + materials |
n/a
|
n/a
|
2 | Commercial Service Size | equipment | Actual Costs |
n/a
|
n/a
|
3 | Costed commercial/industrial meter connections | equipment | Actual Costs |
n/a
|
n/a
|
Customer-Requested
Meter Removal/Re-Installation (including required turn-on/off, regular hours - Monday-Friday, 8:30 am - 4:30 pm) |
|||||
1 | Standard Residential Service Size (regular hours) | removal | $52.00 |
n/a
|
n/a
|
2 | Commercial Service Size (regular hours) | removal | Actual Costs |
n/a
|
n/a
|
3 | Standard Residential Service Size (after hours) | removal | $80.00 |
n/a
|
n/a
|
4 | Commercial Service Size (after hours) | removal | Actual Costs |
n/a
|
n/a
|
5 | Returned Cheque Payments/N.S.F. Charges (non-water/sewer accounts) | cheque | $15.00 |
n/a
|
n/a
|
6 | Landfill Ticket Copies | copy | $10.00 |
n/a
|
n/a
|
Meter Installation Charges Sub-Divisions and Flat Rate | |||||
1 | Meter Size, 16mm x 19mm | meter | $260.00 |
n/a
|
n/a
|
2 | Meter Size, 19mm | meter | $314.00 |
n/a
|
n/a
|
3 | Meter Size, 25mm | meter | $371.00 |
n/a
|
n/a
|
Meter Installation
Charges Industrial, Commercial, Institutional (38mm and greater are applicant installed) |
|||||
1 | Meter Size, 16mm x 19mm | meter | $303.00 |
n/a
|
n/a
|
2 | Meter Size, 19mm | meter | $370.00 |
n/a
|
n/a
|
3 | Meter Size, 25mm | meter | $436.00 |
n/a
|
n/a
|
4 | Meter Size, 38mm | meter | $830.00 |
n/a
|
n/a
|
5 | Meter Size, 50mm | meter | $950.00 |
n/a
|
n/a
|
6 | Meter Size, 75mm Tru-Flo | meter | $2,832.00 |
n/a
|
n/a
|
7 | Meter Size, 100mm Tru-Flo | meter | $3,810.00 |
n/a
|
n/a
|
8 | Meter Size, 150mm Tru-Flo | meter | $7,900.00 |
n/a
|
n/a
|
9 | Meter Size, 150mm Protectus Fireline and Domestic use | meter | $10,280.00 |
n/a
|
n/a
|
10 | Meter Size, 200mm Protectus Fireline and Domestic use | meter | $13,840.00 |
n/a
|
n/a
|
11 | Meter Size, 250mm Protectus Fireline and Domestic use | meter | $19,150.00 |
n/a
|
n/a
|
Frozen &
Damaged Meters - All charges are pro-rated charges based on the remaining life of the meter |
|||||
1 | Meter Size, 16 mm & 16mm X 19mm | Actual costs | $127.46 down to $9.10 |
n/a
|
n/a
|
2 | Meter Size, 19mm | Actual costs | $166.99 down to $11.93 |
n/a
|
n/a
|
3 | Meter Size, 25mm | Actual costs | $198.07 down to $14.15 |
n/a
|
n/a
|
4 | Meter Size, 38mm | Actual costs | $489.60 down to $34.97 |
n/a
|
n/a
|
5 | Meter Size, 50mm | Actual costs | $602.40 down to $43.03 |
n/a
|
n/a
|
6 | Meter Size, 75mm Tru-Flo | Actual costs | $2,429.08 down to $173.51 |
n/a
|
n/a
|
7 | Meter Size, 100mm Tru-Flo | Actual costs | $3,310.34 down to $236.45 |
n/a
|
n/a
|
8 | Meter Size, 150mm Tru-Flo | Actual costs | $7,123.66 down to $508.83 |
n/a
|
n/a
|
9 | Meter Size, 150mm Protectus | Actual costs | $9,289.33 down to $663.52 |
n/a
|
n/a
|
10 | Meter Size, 200mm Protectus | Actual costs | $12,594.68 down to $899.52 |
n/a
|
n/a
|
11 | Meter Size, 250mm Protectus | Actual costs | $17,512.78 down to $1,250.91 |
n/a
|
n/a
|
Upgrading and Downgrading | |||||
1 | Meter Size, 16mm X 19mm | Actual costs | $142.90 |
n/a
|
n/a
|
2 | Meter Size, 19mm | Actual costs | $188.49 |
n/a
|
n/a
|
3 | Meter Size, 25mm | Actual costs | $230.81 |
n/a
|
n/a
|
4 | Meter Size, 38mm | Actual costs | $574.69 |
n/a
|
n/a
|
5 | Meter Size, 50mm | Actual costs | $699.04 |
n/a
|
n/a
|
6 | Meter Size, 75mm Tru-Flo | Actual costs | $2,601.48 |
n/a
|
n/a
|
7 | Meter Size, 100mm Tru-Flo | Actual costs | $3,532.63 |
n/a
|
n/a
|
8 | Meter Size, 150mm Tru-Flo | Actual costs | $7,601.20 |
n/a
|
n/a
|
9 | Meter Size, 150mm Protectus Fireline and Domestic use | Actual costs | $9,911.72 |
n/a
|
n/a
|
10 | Meter Size, 200mm Protectus Fireline and Domestic use | Actual costs | $13,438.42 |
n/a
|
n/a
|
11 | Meter Size, 250mm Protectus Fireline and Domestic use | Actual costs | $18,685.73 |
n/a
|
n/a
|
Meter Test
Request Meter is removed and sent to third party for testing |
|||||
1 | Meter Size, 16mm X 19mm | Actual costs | $191.00 |
n/a
|
n/a
|
2 | Meter Size, 19mm | Actual costs | $196.00 |
n/a
|
n/a
|
3 | Meter Size, 25mm | Actual costs | $213.00 |
n/a
|
n/a
|
4 | Meter Size, 38mm | Actual costs | $288.00 |
n/a
|
n/a
|
5 | Meter Size, 50mm | Actual costs | $313.00 |
n/a
|
n/a
|
6 | Meter Size, 75mm | Actual costs | $451.00 |
n/a
|
n/a
|
7 | Meter Size, 100mm | Actual costs | $501.00 |
n/a
|
n/a
|
8 | Meter Size, 150mm | Actual costs | $656.00 |
n/a
|
n/a
|
Meter Test
Request Third Party Field Test |
|||||
1 | Meter Size 75 mm to 150 mm | Actual costs | $675.00 |
n/a
|
n/a
|
2 | Meter Size 100 mm to 250 mm Protectus | Actual costs | $675.00 |
n/a
|
n/a
|
Payroll Employee Personal Service Deductions offered through Payroll (annual charge) | |||||
1 | Insurance Deductions (car, home) | employee | $7.00 |
n/a
|
n/a
|
2 | Recreational Centre Memberships | employee | $7.00 |
n/a
|
n/a
|
3 | Other Employee Optional Services | employee | $7.00 |
n/a
|
n/a
|
4 | Payroll Service for other Organizations & service unit to direct deposit. | deposit/cheque | $7.00 |
n/a
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | Compliance Letters (inquiries on compliance with Regional conditions for sale/purchase of property) | letter | $70.00 |
n/a
|
n/a
|
2 | Front-end Financing Agreements (FEFA) - developer to compensate the Region for staff time* | per agreement | Actual Costs |
n/a
|
n/a
|
* All staff time required for the processing, review and execution of a FEFA are to be recovered from the proponent -billing rates will be set at the specific staff rate established for internal charge purposes. | |||||
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Prenatal/Postpartum Class Fees* | |||||
1 | Client File Summary Letters | letter | $75.00 |
n/a
|
n/a
|
2 | How to Breast Feed Your Baby (booklet) | copy | $1.00 |
n/a
|
n/a
|
3 Keep on Track resource binder | binder | $75.00 |
n/a
|
n/a
|
|
*The Reproductive Health Supervisor is delegated the authority to exempt in whole or in part, any client from paying Prenatal/Postpartum Class Fees, on the basis of inability to pay, in cases where clients are experiencing financial hardship. | |||||
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Heartmobile Fees ** | |||||
1 | Within Peel | client | $10.00 |
n/a
|
n/a
|
2 | Outside Peel | client | $75.00 |
n/a
|
n/a
|
3 | Cancellation Fee | cancellation | $100.00 |
n/a
|
n/a
|
**The Heartmobile requires a minimum of 30 clients per day at the per diem rate. More than 30 clients will be charged at the per diem rate. | |||||
1 | Well Worth it Forum | participant | $75 to $125 based on session offered |
n/a
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | Food Handler Course Fees | client | $30.00 |
n/a
|
n/a
|
2 | Swimming Pool Operator Course Fees | client | $50.00 |
n/a
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Healthy Sexuality Clinic Fees *& ** | |||||
1 | Oral Contraceptives/Emergency Contraceptive Pills | package | $8.00 |
n/a
|
n/a
|
2 | Anti-Fungal Creams | package | $10.00 |
n/a
|
n/a
|
3 | Contraceptive Sponges | package | $6.00 |
n/a
|
n/a
|
4 | Intra-Uterine Devices | package | $50.00 |
n/a
|
n/a
|
5 | Antibacterial Antiprotozoal Products | package | 5.00 (stat), 10.00 (other) |
n/a
|
n/a
|
6 | Contraceptive Patch | package | $20.00 |
n/a
|
n/a
|
7 | Contraceptive Foam Products | package | $10.00 |
n/a
|
n/a
|
8 | Contraceptive Injection | injection | $25.00 |
n/a
|
n/a
|
9 | Program Manuals | manual | $25.00 |
n/a
|
n/a
|
10 | Thermometers | client | $26.00 |
n/a
|
+
|
* Healthy Sexuality staff (physicians, supervisors,
managers, registered nurses, public health nurses all of whom are employed
by the Region of Peel) are delegated the authority to exempt, in whole or
in part, any client from paying Healthy Sexuality Clinic Fees, on the basis
of inability to pay, in cases where clients are experiencing financial hardship.
** Healthy Sexuality staff (physicians, supervisors, managers, registered nurses, public health nurses all of whom are employed by the Region of Peel) are delegated the authority to adjust, in whole or in part the Current Fee, as a result of changes to the cost of existing products and/or changes in products as directed by the Ministry of Health and Long-Term Care. |
|||||
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Archives Fees* | |||||
1 | Photocopies | copy | $0.50 |
n/a
|
n/a
|
2 | Prints Produced In-House - 3" x 5" | $8.00 |
n/a
|
n/a
|
|
3 | Prints Produced In-House - 5" x 7" | $10.00 |
n/a
|
n/a
|
|
4 | Prints Produced In-House - 8" x 10" | $12.00 |
n/a
|
n/a
|
|
5 | SCANS to Disk | item | $10.00 |
n/a
|
n/a
|
6 | Sepia-toned Reproductions | $2.00 |
+
|
n/a
|
|
7 | Non-Research Uses | item | $25.00 |
+
|
n/a
|
8 | Non-Research Uses - Deposit | item | $25.00 |
+
|
n/a
|
9 | Genealogical Inquiries | hour | $25.00 |
+
|
n/a
|
10 | Genealogy Course | person | $50.00 |
n/a
|
n/a
|
* Friends of the Peel Heritage Complex receive a 10% discount on all Archive Fees. | |||||
Education Program Fees | |||||
1 | Education and O.A.S. Kits (rental) | 2 weeks | $30.00 |
n/a
|
n/a
|
2 | Art Gallery Exhibition Fees | exhibit | $2,000.00 |
+
|
n/a
|
3 | In-House Sessions Art Studio | student | $85.00 |
n/a
|
n/a
|
4 | Art Camps (March/Summer) week of 1/2 days & Inmates for the Afternoon | child | $150.00 |
n/a
|
n/a
|
5 | Art for Teens (8 weeks of 1 evening per week) | child | $150.00 |
n/a
|
n/a
|
6 | Art in the Afternoon | child | $5.00-$7.00 |
n/a
|
n/a
|
7 | School Visit Tours of Art Gallery & Museum | student | $3.00-$7.00 |
n/a
|
n/a
|
8 | Guide/Scout Tours** | group | $60.00 |
n/a
|
n/a
|
** for 20 children, $2 for each additional child | |||||
1 | Facility Rental per hour during business hours | hour | $25.00 |
+
|
n/a
|
2 | Facility Rental per hour during non-business hours | hour | $50.00 |
+
|
n/a
|
3 | Facility Rental per day during business hours | day | $150.00 |
+
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Courtroom Use Fees - Weekdays (occupancy 150 people)* | |||||
1 | 8:30 am to 12:00 pm/1:00 pm to 4:30 pm | time period | $400.00 |
+
|
n/a
|
2 | 6:00 pm to 10:00 pm | time period | $500.00 |
+
|
n/a
|
3 | 8:30 am to 4:30 pm | time period | $600.00 |
+
|
n/a
|
Courtroom Use Fees - Weekends (occupancy 150 people)* | |||||
1 | 8:00 am to 12:00 pm/1:00 pm to 4:00 pm | time period | $400.00 |
+
|
n/a
|
2 | 6:00 pm to 10:00 pm | time period | $500.00 |
+
|
n/a
|
3 | 8:00 am to 4:00 pm | time period | $600.00 |
+
|
n/a
|
*Balcony not available due to safety issue liability | |||||
Council Chambers Use Fees - Week days (occupancy 60 people) | |||||
1 | 6:00 pm to 10:00 pm | time period | $750.00 |
+
|
n/a
|
Council Chambers Use Fees - Weekends (occupancy 60 people) | |||||
1 | 8:00 am to 12:00 pm/1:00 pm to 4:00 pm | time period | $400.00 |
+
|
n/a
|
2 | 6:00 pm to 10:00 pm | time period | $500.00 |
+
|
n/a
|
3 | 8:00 am to 10:00 pm | time period | $1,000.00 |
+
|
n/a
|
4 | Wedding Rehearsals (est. 1 hr. use) | rehearsal | $100.00 |
+
|
n/a
|
5 | Wedding Package (rehearsal, reception, wedding) | package | $1,000.00 |
+
|
n/a
|
Film Productions: | |||||
1 | Set up/dismantle plus additional expenses (i.e.. Security, Janitorial) | per 16 hour day | $2,000 + expenses |
+
|
n/a
|
2 | Film Shoot Days plus additional expenses (i.e.. Security , Janitorial) | per 16 hour day | $2,500 + expenses |
+
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | Easement Release Fees (application for deletion/release of easement, right-of-way) | application | $300.00 |
+
|
n/a
|
Encroachments | |||||
1 | Regional Roads | application | $500.00 |
+
|
n/a
|
2 | Regional Easements | application | $350.00 |
+
|
n/a
|
3 | Regional Property | application | $500.00 |
+
|
n/a
|
Annual Fee for Encroachment | |||||
1 | Residential/Farm Land* | year | $100.00 |
+
|
n/a
|
2 | Non-Residential/Non-Farm Land* | year | $300.00 |
+
|
n/a
|
3 | Miscellaneous Request* | per request | $50.00 |
+
|
n/a
|
* Minimum Fee (Each application to be considered individually) | |||||
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Sub-Delegated Plans Processing &
Commenting - Mississauga/Brampton/Caledon
|
|||||
1 | Plans of Subdivision | plan | $1,575.00 |
n/a
|
n/a
|
2 | Recirculation of Plan of Subdivision - major revision | plan | $1,395.00 |
n/a
|
n/a
|
3 | Recirculation of Plan of Subdivision - minor revision | plan | $525.00 |
n/a
|
n/a
|
4 | Plans of Condominium | plan | $735.00 |
n/a
|
n/a
|
Application to Amend the Regional Official Plan | |||||
1 | Application Requiring Full Circulation | application | $6,175.00 |
n/a
|
n/a
|
2 | Application not Requiring Full Circulation | application | $5,125.00 |
n/a
|
n/a
|
3 | Review of Area Municipal Plan Amendments (exempt from Regional approval) | review | $525.00 |
n/a
|
n/a
|
4 | Approval of Area Municipal Plan Amendments | approval | $1,050.00 |
n/a
|
n/a
|
Appeal | |||||
1 | Appeal where staff are not required to attend OMB hearing | approval | $250.00 |
n/a
|
n/a
|
2 | Appeal where staff are required to attend OMB hearing | approval | $500.00 |
n/a
|
n/a
|
3 | Close File Retrieval | file | $25.00 |
n/a
|
n/a
|
Planning Publications | |||||
1 | Highway 10/410 Transit Corridor Study | copy | $28.04 |
+
|
n/a
|
2 | Lester B. Pearson International Airport West Side Ground Access Study | copy | $23.36 |
+
|
n/a
|
3 | Region of Peel Commuter Rail Station Location Study | copy | $14.02 |
+
|
n/a
|
4 | Peel High Occupancy Vehicle System Strategy Study, January 1995 | copy | $28.04 |
+
|
n/a
|
5 | Region of Peel Travel Demand Forecasting Model - Calibration, Validation and Application, April 1996 | copy | $28.04 |
+
|
n/a
|
6 | 1998 Screenline/Cordon Count Program (Directional Summaries) | copy | $40.19 |
+
|
n/a
|
7 | Waste Collection, Design Standards Manual for New Developments | copy | $2.34 |
+
|
n/a
|
8 | Street Names Index | copy | $32.71 |
+
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Planning Publications | |||||
1 | Regional Official Plan (ROP), July 1996 | copy | $42.06 |
+
|
n/a
|
2 | Office Consolidation Modifications & Appeals | copy | $32.71 |
+
|
n/a
|
3 | Office Consolidation, November 1997 | copy | $42.06 |
+
|
n/a
|
4 | Office Consolidation, January 1998 | copy | $46.73 |
+
|
n/a
|
5 | Office Consolidation, September 1998 | copy | $46.73 |
+
|
n/a
|
6 | Office Consolidation, May 2001 | copy | $46.73 |
+
|
n/a
|
7 | Environment Strategy Study Workshop Documentation, November 1993 | copy | $4.67 |
+
|
n/a
|
8 | Environment Strategy Study Final Report, January 1994 | copy | $4.67 |
+
|
n/a
|
9 | Resources Strategy Study - Stage One - Workshop Discussion Paper, November 1993 | copy | $4.67 |
+
|
n/a
|
10 | Resources Strategy Study - Stage Two - Workshop Documentation, November 1993 | copy | $4.67 |
+
|
n/a
|
11 | Resources Strategy Study - Stage Three - Final Report, January 1994 | copy | $4.67 |
+
|
n/a
|
12 | Cost of Development Study II Final Report, February 1996 | copy | $23.36 |
+
|
n/a
|
13 | Environmental Planning Policy Study, 1993 - The Role of the Region in Environmental Planning | copy | $9.35 |
+
|
n/a
|
14 | Environmental Planning Policy Study, 1993 - Environmental Data Model | copy | $9.35 |
+
|
n/a
|
15 | Environmental Planning Policy Study, 1993 - Inventory of Key Environmental Indicators | copy | $9.35 |
+
|
n/a
|
16 | Environmental Planning Policy Study, 1993 - Annotated Bibliography | copy | $9.35 |
+
|
n/a
|
17 | The Flexible Region - Regional Structure Strategy, January 1994 | copy | $14.02 |
+
|
n/a
|
18 | Review of 1991 Census Place of Work Data, February 1997 | copy | $18.69 |
+
|
n/a
|
19 | Settlement History of Peel | copy | $4.67 |
+
|
n/a
|
20 | State of Environment Atmosphere Report, December 1995 | copy | $14.02 |
+
|
n/a
|
21 | State of Environment Atmosphere Summary Report December 2002 | copy | $14.02 |
+
|
n/a
|
22 | State of Environment Atmosphere Summary Report and Technical Report on CD, December 2002 | copy | $18.69 |
+
|
n/a
|
23 | State of Environment Water Report, December 1996 | copy | $18.69 |
+
|
n/a
|
24 | Population, Household and Employment Projections 1996 - 2031, January 1999 | copy | $14.02 |
+
|
n/a
|
25 | State of Environment, Land Report, 1998 | copy | $28.04 |
+
|
n/a
|
26 | Regional Planning Atlas | copy | $23.36 |
+
|
n/a
|
27 | Maps | map | Actual Costs |
+
|
+
|
Retail Business Holidays Act - Tourism
Exemption Applications - Establishments in Mississauga/Brampton
|
|||||
1 | Processing | application | $1,500.00 |
n/a
|
n/a
|
2 | Advertising | application | $1,700.00 |
n/a
|
n/a
|
3 | Refund* | application | $2,700.00 |
n/a
|
n/a
|
*A refund is provided if the application is not permitted to proceed to a public meeting or is withdrawn by an applicant before arrangements for the advertisement of a public meeting in respect of that application have been made. A refund in the amount of realized cost savings shall be made where advertisement of a public meeting in respect of two or more applications results in cost savings. | |||||
Retail Business Holidays Act - Tourism
Exemption Applications - Establishments in Caledon
|
|||||
1 | Processing | application | $1,500.00 |
n/a
|
n/a
|
2 | Advertising | application | $1,075.00 |
n/a
|
n/a
|
3 | Refund* | application | $2,075.00 |
n/a
|
n/a
|
*A refund is provided if the application is not permitted to proceed to a public meeting or is withdrawn by an applicant before arrangements for the advertisement of a public meeting in respect of that application have been made. A refund in the amount of realized cost savings shall be made where advertisement of a public meeting in respect of two or more applications results in cost savings. | |||||
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Local Improvement Sanitary Sewer Charges
|
|||||
1 | Frontage Rate | metre | $345.00 |
n/a
|
n/a
|
2 | Connection Charge (residential) | lot | $2,000.00 |
n/a
|
n/a
|
3 | Connection Charge (industrial) | lot | Actual Costs |
n/a
|
n/a
|
Contract Plans & Documents | |||||
1 | Volume 1 (prequalified) - hard copy* | document | $40.00 |
n/a
|
n/a
|
2 | Volume 1 - hard copy* | document | $15.00 |
n/a
|
n/a
|
3 | Volume 2 - hard copy | document | $25.00 |
n/a
|
n/a
|
4 | Contract Plans (1-20 sheets)* | set | $15.00 |
n/a
|
n/a
|
*For contracts greater than 40 sheets the price will be based on actual document costs. | |||||
Reports & Studies | |||||
1 | All Approved Reports & Studies | copy | Actual Printing Costs + Admin |
n/a
|
n/a
|
Regional Design Guidelines | |||||
1 | Landscaping Guidelines for Regional Roads | copy | $35.00 |
n/a
|
n/a
|
2 | Design Criteria Manual | copy | $25.00 |
n/a
|
n/a
|
3 | Material Specifications & Standard Drawings | copy | $25.00 |
n/a
|
n/a
|
4 | Water/Wastewater Map Book | book | $85.00 |
n/a
|
n/a
|
5 | 20 Year Regional D.C. Plan Map | each | $15.00 |
n/a
|
n/a
|
6 | 5-Year Capital Budget & Forecasts Map | each | $15.00 |
n/a
|
n/a
|
Comprehensive Watermain Drawings | |||||
1 | Engineering Drawings (on paper) 2ft x 3ft | drawing | $12.65 |
n/a
|
n/a
|
2 | Engineering Drawings (11 x 17) | map | 1st 5 copies free, $5.00 each additional copy |
n/a
|
n/a
|
3 | Custom Geomedia Plots linear | foot | $5.00 |
n/a
|
n/a
|
Subdivision Engineering & Inspection Fees ( % estimated cost of Regional works where subdivision being developed) | |||||
$0 - $100,000 | |||||
1 | Mississauga | cost of work | 4.5% or a minimum charge of $3,200 |
n/a
|
n/a
|
2 | Brampton | cost of work | 3.5% or a minimum charge of $3,200 |
n/a
|
n/a
|
3 | Caledon | cost of work | 4.0% or a minimum charge of $3,200 |
n/a
|
n/a
|
Greater than $100,000 - $500,000 | |||||
1 | Mississauga | cost of work | 4.00% |
n/a
|
n/a
|
2 | Brampton | cost of work | 3.50% |
n/a
|
n/a
|
3 | Caledon | cost of work | 3.50% |
n/a
|
n/a
|
Greater than $500,000 | |||||
1 | Mississauga | cost of work | 3.50% |
n/a
|
n/a
|
2 | Brampton | cost of work | 3.50% |
n/a
|
n/a
|
3 | Caledon | cost of work | 3.00% |
n/a
|
n/a
|
Subdivision/New Main Fees | |||||
1 | Subdivision Hydrant Inspections - Untampered | hydrant | $440.00 |
n/a
|
n/a
|
2 | Subdivision Hydrant Inspections - Tampered | hydrant | $90.00 |
n/a
|
n/a
|
3 | Subdivision Pressure/Chlorination Tests (for additional tests) | section (300m) | Actual costs or a minimum charge of $1,100 |
n/a
|
n/a
|
4 | Surcharge for Staging Review & Inspection | each | $1,200.00 |
n/a
|
n/a
|
5 | Cost for Updating as Constructed Information | per KM of pipe | $484.46 |
+
|
n/a
|
6 | Cost to Maintain Adequate Chlorine Residuals | Cost of Work | Actual Costs |
+
|
n/a
|
Telecommunication Processing Fees | |||||
1 | Telecommunication Permit Approval Fees (incl. Inspection of 200 meters/656.2 feet) | per application | $405.00 |
n/a
|
n/a
|
2 | Additional Inspection fees if greater than 200 meters/656.2 feet | per meter | $0.30 |
n/a
|
n/a
|
3 | Annual Municipal Access Agreement Fee | per agreement | per negotiated agreement |
n/a
|
n/a
|
Pavement Degradation Fee | |||||
1 | Last Reconstruction or Last Resurfacing 0 to 5 (yrs) | per square meter | $22.00 |
n/a
|
n/a
|
2 | Last Reconstruction or Last Resurfacing 6 to 10 (yrs) | per square meter | $13.00 |
n/a
|
n/a
|
3 | Last Reconstruction or Last Resurfacing more than 10 (yrs) | per square meter | $6.00 |
n/a
|
n/a
|
MOE PROCESSING FEES | |||||
For Further details, refer to Guide for Applying for Approval Municipal and Private Water and Sewage Works, Section 52 and 53, Ontario Water Resources Act R.S.O. 1990 as amended by Services Improve Act, S.O. 1997 | |||||
A) WATER WORKS | |||||
1 | Administrative processing. | cost of work | $200.00 |
n/a
|
n/a
|
Water Conservation/efficiency Program | |||||
1 | Rain Barrels | each | $43.48 |
+
|
+
|
2 | Indoor Water Efficiency Kits | each | $4.35 |
+
|
+
|
3 | Outdoor Water Efficiency Kits | each | $13.05 |
+
|
+
|
A new intake for extraction of surface or ground water, or the expansion of the capacity of an existing intake. | |||||
1 | If the maximum design capacity is not more than 4,550 cubic metres per day | cost of work | $5,000.00 |
n/a
|
n/a
|
2 | If the maximum design capacity is more than 4,550 cubic metres per day | cost of work | $10,000.00 |
n/a
|
n/a
|
3 | Watermains and appurtenances, including hydrants | cost of work | $1,000.00 |
n/a
|
n/a
|
4 | Highlift booster pumping stations, reservoirs or elevated tanks | cost of work | $2,000.00 |
n/a
|
n/a
|
5 | Review of Hydrogeological Assessment | cost of work | $3,000.00 |
n/a
|
n/a
|
6 | Administrative amendments (no technical review involved) | cost of work | $100.00 |
n/a
|
n/a
|
7 | Administrative processing (applies to all amendment, except administrative amendments) | cost of work | $200.00 |
n/a
|
n/a
|
8 | A treatment plant upgrade, including new treatment | cost of work | $3,000.00 |
n/a
|
n/a
|
B) SEWAGE WORKS | |||||
1 | Administrative processing | cost of work | $200.00 |
n/a
|
n/a
|
2 | A municipal or private facility for the treatment and disposal of sewage treatment plant, including the expansion, re-rating or upgrading of an existing facility that involves an increase in the rated capacity of the facility | cost of work | $5,000.00 |
n/a
|
n/a
|
3 | If the maximum design capacity is not more than 4550 cubic metres per day | cost of work | $5,000.00 |
n/a
|
n/a
|
4 | If the maximum design capacity is more than 4550 cubic metres per day | cost of work | $10,000.00 |
n/a
|
n/a
|
5 | A facility for attenuating stormwater runoff peak flow rate or volume or for managing stormwater runoff quality, such as detention or retention pools | cost of work | $2,000.00 |
n/a
|
n/a
|
A subsurface disposal facility, including the expansion of an existing facility that involves an increase in the rated capacity of the facility. | |||||
1 | If the design capacity of the facility is not more than 15 cubic metres per day | cost of work | $600.00 |
n/a
|
n/a
|
2 | If the design capacity of the facility is more than 15 cubic metres per day and not more than 50 cubic metres per day | cost of work | $1,500.00 |
n/a
|
n/a
|
3 | If the design capacity of the facility is more than 50 cubic metres per day | cost of work | $3,000.00 |
n/a
|
n/a
|
4 | A facility for the treatment and disposal of industrial process wastewater, including contact cooling water, including the expansion of an existing facility that involves and increase in the rated capacity of the facility | cost of work | $6,000.00 |
n/a
|
n/a
|
5 | A facility for the disposal of spent water from a non-contact industrial cooling process | cost of work | $1,000.00 |
n/a
|
n/a
|
6 | Storm and sanitary sewers and appurtenances, including expansion of existing sewers | cost of work | $900.00 |
n/a
|
n/a
|
7 | Storm and sanitary pump stations, force mains and sanitary sewage detention chambers or oversized sewers, including the expansion of an existing facility that involves an increase in the rated capacity of the facility | cost of work | $1,800.00 |
n/a
|
n/a
|
8 | Review of Hydrogeological Assessment | cost of work | $3,000.00 |
n/a
|
n/a
|
9 | Administrative amendments (no technical review involved). | cost of work | $100.00 |
n/a
|
n/a
|
10 | Administrative processing (applies to all amendment, except administrative amendments) | cost of work | $200.00 |
n/a
|
n/a
|
Water Service Connection Charges | |||||
1 | 25mm Service including 19mm meter | connection | $3,996.00 |
n/a
|
n/a
|
2 | 19mm Service including 16x19mm meter | connection | $3,942.00 |
n/a
|
n/a
|
3 | larger than 25mm Service | connection | Actual Costs |
n/a
|
n/a
|
Cancellation Charges (if applicant cancels water service application for any reason) | |||||
1 | Flat Rate Connection | connection | $20.00 |
n/a
|
n/a
|
2 | Costed Meter Connection | connection | $55.00 |
n/a
|
n/a
|
3 | MTO Road Cut Permit | permit | $350.00 |
n/a
|
n/a
|
Connection Administration & Inspection Fees (applicant-installed) | |||||
1 Water Service - long side (road crossing) | inspection | $843.00 |
n/a
|
n/a
|
|
2 Water Service - short side (no crossing) | inspection | $843.00 |
n/a
|
n/a
|
|
3 Water Service - hydrant & valve | inspection | $843.00 |
n/a
|
n/a
|
|
4 Sewer Service | inspection | $843.00 |
n/a
|
n/a
|
|
5 Chlorination | line | $300.00 |
n/a
|
n/a
|
|
Traffic Information/Administration Fees (Traffic Operations) | |||||
1 | ATR Count per location | per year | $30.84 |
+
|
n/a
|
2 | 24-Hour Volume Map | per map per year | $60.75 |
+
|
n/a
|
3 | 8-Hour Manual Count | count per year | $60.75 |
+
|
n/a
|
4 | Providing Collision Information | per location per year | $30.84 |
+
|
n/a
|
Traffic Information/Administration Fees (Traffic Signals and Systems) | |||||
1 | Signal Timing Fees | timing plan | $121.50 |
+
|
n/a
|
2 | Legal Letter | letter | $364.49 |
+
|
n/a
|
3 | Maintenance Recovery Administration Cost | recovery | $154.21 |
+
|
n/a
|
Traffic Development/Administration Fees (Traffic Development) | |||||
1 | Site Plan Review/Development Applications/ Engineering & Inspection Fees - % estimated cost of Regional work | cost of work | 6% or minimum charge of $1,200 |
n/a
|
n/a
|
2 | Temporary Access Fee | permit | $250.00 |
n/a
|
n/a
|
Roads Fees |
|||||
1 | Excess Load Permits (annual) | permit | $100.00 |
n/a
|
n/a
|
2 | Excess Load Permits (single/multiple) | permit | $100.00 |
n/a
|
n/a
|
3 | Road Occupancy | permit | $250.00 |
n/a
|
n/a
|
4 | Filming/Advertising Permits | permit | $182.00 |
n/a
|
n/a
|
5 | Special Event - Road Closure Permits* | permit | $518.00 |
n/a
|
n/a
|
6 | Special Event - no Road Closure | event | $259.00 |
n/a
|
n/a
|
*Plus actual costs | |||||
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | Hydrant Flow Tests | test | $219.36 |
+
|
n/a
|
2 | Additional Hydrants | hydrant | $109.68 |
+
|
n/a
|
Emergency Sewer Back-Up Charges |
|||||
1 | Residential - Monday to Friday 7:30 am to 4:00 pm excluding holidays | call | $250.00 |
+
|
n/a
|
2 | Residential - After Hours (at 1.5 overtime - 2 hour min. call) | call | $250.00 |
+
|
n/a
|
3 | Residential - After Hours (at 2.0 overtime - 2 hour min. call) | call | $250.00 |
+
|
n/a
|
4 | Commercial/Industrial/Condominium | service | Actual Costs |
+
|
n/a
|
TV Inspections |
|||||
1 | Residential - Monday to Friday 7:30 am to 4:00 pm excluding holidays | call | $240.00 |
+
|
n/a
|
2 | Commercial/Industrial/Condominium | service | Actual Costs |
+
|
n/a
|
Watermain Tapping Fees ( 0 mm to 300 mm) |
|||||
1 | Regular Hours 7:00 am - 4:00 pm | tap | $365.11 |
n/a
|
n/a
|
2 | Work beyond four hours | hour | $91.28 |
n/a
|
n/a
|
3 | After Regular Hours & Saturdays | tap | $518.66 |
n/a
|
n/a
|
4 | Work beyond four hours | hour | $129.67 |
n/a
|
n/a
|
5 | Sundays & Holidays | tap | $672.00 |
n/a
|
n/a
|
6 | Work beyond four hours | hour | $168.05 |
n/a
|
n/a
|
Roads Fees |
|||||
1 | Culvert cost | culvert | Actual Costs |
+
|
n/a
|
2 | Tourism Signs on Regional Roads | year | $153.00 |
n/a
|
n/a
|
Hydrant Permits |
|||||
1 | Administration Charge (+ charge for water used based on current rates) | permit | $150.00 |
n/a
|
n/a
|
2 |
Meter Rental Fee (no charge for first day) |
day | $1.50 |
+
|
+
|
3 | Frozen Meter & Appurtenances/Hydrant | meter | Actual Costs |
n/a
|
n/a
|
4 | Large Meter & Appurtenances returned broken | meter | Actual Costs |
+
|
n/a
|
5 | Large Meter& Appurtenances lost/not returned | meter | Actual Costs |
+
|
n/a
|
6 | Lost Valve | valve | Actual Costs |
+
|
+
|
7 | Assumed consumption rate/per day | per day | $22.00 |
n/a
|
n/a
|
Unauthorized Water Usage |
|||||
1 | Unauthorized Use of Hydrant without Permit | hydrant | $575.00 |
n/a
|
n/a
|
2 | Hydrant repair | hydrant | Actual Costs |
+
|
n/a
|
3 | Unauthorized Valving | valve | $575.00 |
n/a
|
n/a
|
4 | Valve repair | valve | Actual Costs |
+
|
n/a
|
Turn on/Turn off Fees (Residential & Commercial) |
|||||
1 | Regular Hours | per service | $60.00 |
n/a
|
n/a
|
2 | After Hours & Saturdays | per service | $60.00 |
n/a
|
n/a
|
3 | Sundays/Stat Holidays | per service | $60.00 |
n/a
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | Compostainer Replacement | Unit | $75.00 |
+
|
+
|
2 | Backyard Composter | unit | $19.00 |
+
|
+
|
3 | Backyard Composter on Environmental Days | unit | $15.00 |
+
|
+
|
4 | Bagged Compost | bag | $2.18 |
+
|
+
|
5 | Compost (Bulk) | tonne | $35.00 |
+
|
+
|
6 | Compost (Bulk) Delivery - within Region of Peel only | tonne | 5$ per tonne - min charge $25 - max charge $40 |
+
|
+
|
7 | Garbage Bag Tags | Per Tag | $1.00 |
n/a
|
n/a
|
8 | Blue Box (Replacement) | box | $5.22 |
+
|
+
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | Spill Clean up | each | Actual Costs |
n/a
|
n/a
|
Waste Monitor Surcharges |
|||||
1 | Labour (2 person crew) inc. Overtime | hour | $114.65 |
+
|
n/a
|
2 | Equipment -Sampler | hour | $3.46 |
+
|
n/a
|
3 | Sampling Baskets | per basket | $200.00 |
+
|
+
|
Water Pollution Analyses |
|||||
1 | Biochemical Oxygen Demand | analysis | $55.32 |
+
|
n/a
|
2 | Suspended Solids | analysis | $32.86 |
+
|
n/a
|
3 | Oil & Grease | analysis | $39.20 |
+
|
n/a
|
4 | Animal/Vegetable/Oil & Grease | analysis | $73.50 |
+
|
n/a
|
5 | Environmental Information Requests | address | $132.73 |
+
|
n/a
|
Capital Works - Water and Wastewater Treatment |
|||||
1 | Contract Plans &Documents (Less than $5.0 Million) | document | $100.00 |
n/a
|
n/a
|
2 | Contract Plans &Documents ($5.0 to $25.0 Million) | document | $150.00 |
n/a
|
n/a
|
3 | Contract Plans &Documents (Greater than $25.0 Million) | document | $200.00 |
n/a
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Full Day: 6-11 hours of care (preschoolers)* | |||||
1 | 5 days per week | Daily | $32.00 |
n/a
|
n/a
|
2 | 4 days per week | Daily | $32.81 |
n/a
|
n/a
|
3 | 3 days per week | Daily | $33.61 |
n/a
|
n/a
|
4 | 2 days per week | Daily | $34.42 |
n/a
|
n/a
|
5 | 1 days per week | Daily | $35.22 |
n/a
|
n/a
|
Part Day: up to 6 hours of care (preschoolers)* | |||||
1 | 5 days per week | Daily | $22.00 |
n/a
|
n/a
|
2 | 4 days per week | Daily | $22.56 |
n/a
|
n/a
|
3 | 3 days per week | Daily | $23.11 |
n/a
|
n/a
|
4 | 2 days per week | Daily | $23.67 |
n/a
|
n/a
|
5 | 1 days per week | Daily | $24.22 |
n/a
|
n/a
|
Full Day: 6-11 hours of care (toddlers)* | |||||
1 | 5 days per week | Daily | $35.72 |
n/a
|
n/a
|
2 | 4 days per week | Daily | $36.62 |
n/a
|
n/a
|
3 | 3 days per week | Daily | $37.52 |
n/a
|
n/a
|
4 | 2 days per week | Daily | $38.42 |
n/a
|
n/a
|
5 | 1 days per week | Daily | $39.32 |
n/a
|
n/a
|
Part Day: up to 6 hours of care (toddlers)* | |||||
1 | 5 days per week | Daily | $24.52 |
n/a
|
n/a
|
2 | 4 days per week | Daily | $25.14 |
n/a
|
n/a
|
3 | 3 days per week | Daily | $25.76 |
n/a
|
n/a
|
4 | 2 days per week | Daily | $26.38 |
n/a
|
n/a
|
5 | 1 days per week | Daily | $27.00 |
n/a
|
n/a
|
*The rate shown is the maximum rate. The minimum rate is 20% of the maximum rate. The actual rate chargeable to a client is determined according to available income, in accordance with Form 1 of Regulation 262 under the Day Nurseries Act. Fees are charged for 260 days per year. | |||||
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 |
Transhelp Adult Fares |
10 trips | $22.50 |
n/a
|
n/a
|
2 | Transhelp Charter Fees - first vehicle (min. 4 hrs.) | vehicle hour | $60.00 |
n/a
|
n/a
|
3 | Transhelp Charter Fees - additional vehicles (min. 4 hrs.) | vehicle hour | $45.00 |
n/a
|
n/a
|
4 | Passenger Assistive Training (4 hrs.) | session | $160.00 |
n/a
|
n/a
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 Seniors Day Program Fees* | day | $17.00 |
n/a
|
n/a
|
|
2 Meals on Wheels/Guest Meals Fees | meal | $6.05 |
n/a
|
n/a
|
|
3 Wanderer's Bracelet | month | $6.00 |
n/a
|
n/a
|
|
4 Hall Rental Fees** | day | $100.00 |
+
|
n/a
|
|
*The fees for the Seniors Day Program are
needs tested at the request of the client, and approved by the Administrator.
** The Administrator of each Long-Term Care Facility is delegated the authority to exempt, in whole or in part, any agency or group from paying Hall Rental Fees, in cases where requiring the agency to pay would create a financial hard ship or where the activity is deemed by the Administrator to be of benefit to the residents. |
|||||
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
Public Sector Network | |||||
1 | Public Sector Network Access Fee (public sector agencies only) | per agreement | per negotiated agreement |
n/a
|
|
Business Solution - Direct service programs | |||||
1 | Distribution Media (disc, CD, DVD and FTP) | unit | Actual Costs |
n/a
|
+
|
SCHEDULE A FOR THE 2005
USER FEES BY-LAW |
Service Unit
|
2005 Current Fee
|
GST
+ |
PST
+ |
|
1 | Personnel File Copy | copy | $123.00 |
n/a
|
n/a
|
1 | Data Analysis Report | per hour | $80.89 |
+
|
n/a
|
1 | Canine Training | per dog | $2,100.00 |
n/a
|
n/a
|
1 | Audio Tapes (CD) - 1st CD | compact disc | $38.61 |
n/a
|
+
|
2 | Audio Tapes (CD) - Additional CD | compact disc | $2.49 |
n/a
|
+
|
1 | Criminal Record Search & Certificate | request | $45.00 |
n/a
|
n/a
|
2 | Senior Citizen Criminal Record Search & Certificate | request | $25.00 |
n/a
|
n/a
|
3 | Expired Volunteer Criminal Record Search & Certificate | request | $25.00 |
n/a
|
n/a
|
4 | Pardon Applicant Checks | request | $80.00 |
n/a
|
n/a
|
1 | M.V.A. Witness Statement | request | $75.00 |
n/a
|
n/a
|
2 | M.V.C. Search/Report | request | $45.00 |
n/a
|
n/a
|
3 | Letter - Occurrence Enquiry | report | $65.00 |
n/a
|
n/a
|
4 | Insurance Information Report | report | $50.00 |
n/a
|
n/a
|
1 | Cyberproof materials Package - 1st Video | video | $50.47 |
+
|
+
|
2 | Cyberproof materials Package - Additional Video | video | $14.95 |
+
|
+
|
3 | Cyberproof materials Package - Sample Kits | Kit | $49.63 |
+
|
+
|
4 | Cyberproof Train the Trainer - Constable | per hour | $64.26 |
+
|
n/a
|
5 | Cyberproof - Vehicle Fee | per KM | $0.46 |
+
|
n/a
|
1 | Visa Prints (price per person) | prints | $20.00 |
n/a
|
n/a
|
2 | Visa Prints (price per family) | prints | $60.00 |
n/a
|
n/a
|
1 | Investigative Constable | per hour | $63.00 |
n/a
|
n/a
|
2 | Vehicle Fee | per KM | $0.46 |
n/a
|
n/a
|
1 | Motor Vehicle Accidents, etc | per photo | $36.45 |
n/a
|
+
|
2 | Contact Sheet (Photograph Proofs) | sheet | $46.73 |
n/a
|
+
|
1 |
Computer Assisted Diagram (report size) / Geodometer EFILE |
per diagram and efile | $113.04 |
+
|
n/a
|
2 | Final Technical Collision Report | per report | $140.19 |
+
|
n/a
|
3 | Collision Investigator Notes (with field sketch) | all officer's notes per collision | $172.90 |
+
|
n/a
|
4 | Collision Scene Video | video | $200.00 |
+
|
+
|
5 | M.V.A Witness - Major Collision | for 1st statement | $94.00 |
+
|
n/a
|
6 | MVA Witness - Additional Statement | for each subsequent statement | $10.00 |
+
|
n/a
|
7 | Event Data Recorder for each Event Data Recorder | report | $102.00 |
+
|
n/a
|
8 | Wincrash Crush Analysis for Speed | for each Wincrash Crush Analysis report | $115.00 |
+
|
n/a
|
1 | PRP Vehicle Recovery | per hour | $36.00 |
+
|
n/a
|
2 | Video Taping - Crown's Disclosure Copy | video | $3.13 |
n/a
|
+
|
3 | Video Taping - Additional Crown's Disclosure Copy | video | $16.37 |
n/a
|
+
|
4 | Video Taping - Additional Copy Defence | video | $25.91 |
+
|
+
|
1 | Administration Fee paid | duty | 15.00% |
+
|
n/a
|
2 | WSIB Recovery paid | duty | 0.40% |
+
|
n/a
|
3 | Employee Health Tax Recovery | paid duty | 1.95% |
+
|
n/a
|