Bovaird Drive – Mississauga Road from Lake Louise Drive/Worthington Avenue to 1.45km west of Heritage Road
Region of Peel has completed the Schedule “C” Environmental Assessment (EA) for improvements to Bovaird Drive from Lake Louise Drive/Worthington Avenue to 1.45km west of Heritage Road.
The EA study examined the:
- need and feasibility for widening and improvements on Bovaird Drive to address short and long term issues related to planned future growth, operational, capacity and storm drainage deficiencies, and the
- transit, pedestrian and biking facilities
Details of the EA can be accessed in the Environmental Study Report.
Study documents
Appendices are as follows:
- Drawing 1 - Existing Conditions (PDF)
- Drawing 2 - Existing Drainage Area Plan (PDF)
- Drawing 3 - Proposed Drainage Area Plan (PDF)
- ESR Plan and Profile (PDF)
- Appendix A – Notice of Commencement (PDF 2.7MB)
- Appendix B – Traffic Study (PDF, 5MB)
- Appendix C – In-Service Road Safety Review (PDF, 1.65MB)
- Appendix D – Geotechnical Investigation Report (PDF, 11MB)
- Appendix E – Structural Inspection Report (PDF, 1.6MB)
- Appendix F – Preliminary Constraint Assessment for Terrestrial Resources &
Environmental Impact Study for Terrestrial Resources (PDF, 9.7MB) - Appendix G – Fish and Fish Habitat Assessment (PDF, 8.5MB)
- Appendix H – Hydrogeologic Investigation (PDF, 18MB)
- Appendix I – Stream Crossing Geomorphological Assessment (PDF, 8MB)
- Appendix J – Stage l Archaeological Assessment (PDF, 5.9MB)
- Appendix K – Built Heritage and Cultural Heritage Landscape Assessmnet (PDF, 3.9MB)
- Appendix L – Traffic Noise Study (PDF, 916KB)
- Appendix M – Air Quality Assessment Report (PDF, 7.5MB)
- Appendix N – Aesthetics/Streetscaping Report (PDF, 9.8MB)
- Appendix O – Meeting Minutes (PDF, 5.2MB)
- Appendix P – PIC #1 (PDF, 5.9MB)
- Appendix Q – PIC #2 (PDF, 13MB)
- Appendix R – Cost Estimate (PDF, 27KB)
- Appendix S – Notice of Completion (PDF, 785KB)
- Appendix T – Comments on Draft ESR (PDF, 1.6MB)
This EA has been finalized and the project has now moved into the next phase ‘Detailed Design & Construction’.
Contact
For questions or inquiries, please contact:
Scott Durdle
Project Manager
Roads – Design and Construction
Tel: 905-791-7800 ext. 5052