A-Z List | Accessible Info | Careers | Contact Us

 
Images from Peel Region Public Works on Twitter
Public Works Transportation Environmental Assessments

Environmental Assessments: Brampton

Archived Page

This page is online for reference purposes only. This page will not be altered or updated in the future. Contact us to request an alternate format of the content in this page.

Mayfield Road from Chinguacousy Road to Heart Lake Road
The Region of Peel has completed the Schedule “C” Environmental Assessment (EA) to examine the need and feasibility for widening, intersection improvements, changes to road and intersection geometrics and pavement rehabilitation on Mayfield Road to address:

  • short and long term issues related to planned future growth
  • operational and servicing deficiencies and
  • road link capacity limitations

The study also reviewed opportunities to facilitate public transit and pedestrian movement.

Details of the EA can be viewed below in the Environmental Study Report.

Study Documents

Appendices are as follows:

This EA has been finalized and the project has now moved into the next phase ‘Detailed Design & Construction’

For questions or inquiries, please contact:

From Chinguacousy Road to Hurontario Street
Jose Montouto, P.Eng.
Project Manager
Roads – Design and Construction
Jose.Montouto@peelregion.ca
Tel: 905-791-7800 ext. 7813

Back to Current Environmental Assesments

Revised: Tuesday July 02 2019

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy | Service Commitment

Smaller Text Larger Text